title: "AiBook.fun — Implementation Plan"
|
||
type: implementation-plan
|
||
status: draft
|
||
owner: Patrick (Product)
|
||
launch-target: 2026-09-26
|
||
last-updated: 2026-08-31
|
||
companions: [AiBook_PRD.md, AiBook_Spec.md]
|
||
---
|
||
|
||
# 📚 AiBook.fun — Implementation Plan
|
||
|
||
> **Status: DRAFT.** The schedule below assumes decisions that aren't final yet (see "Do this
|
||
> week"). Dates, owners, and dollar figures are planning assumptions until signed off. This is a
|
||
> **living document** — update it weekly with actual dates and owners. See
|
||
> [Appendix — What changed](#appendix--what-changed-in-this-revision) for how this revision
|
||
> differs from the prior draft.
|
||
|
||
**The clock:** today is 31 Aug 2026; **launch is 26 Sep 2026**. Domain and price are signed.
|
||
Content is the remaining critical path.
|
||
|
||
**The critical path in one line:**
|
||
`assign MLL authors + D-3 co-authors → write the library → freeze copy → no-crypto scrub → submit to Kickstarter → launch 9/26`
|
||
|
||
---
|
||
|
||
## Do this week (the real gate zero)
|
||
|
||
Before any copy or build locks, close these. Most are decisions or de-risking, not building.
|
||
|
||
| # | Task | Owner | Why it's first |
|
||
|:--|:--|:--|:--|
|
||
| 0.1 | **~~Renew aibook.fun~~ Done 2026-08-31.** | Registrar owner | Closed. |
|
||
| 0.2 | **~~Pricing spine~~ Done 2026-08-31.** **$47/yr** is the product. No lifetime SKU as an equal. Founding writers on **contract** (v1 authored). | Commercial + Product | Copy freeze unblocked on price. |
|
||
| 0.3 | **~~Ratify the North-Star + product-health floors~~ Done 2026-08-29.** Activation 20/35 from access date; campaign waitlist 50/100; post-key submissions 10/25 in 90 days; renewal 40/60 excluding lifetime; curation is an ops SLA, not a launch bar. See PRD §8. | Product (@pat) | Locked. Don't quote 60% renewal publicly. |
|
||
| 0.4 | **Ratify the Minimum Lovable Library number and assign every workflow an author.** | Product + co-authors | This is the #1 risk; turn it from hope into owned work. |
|
||
| 0.5 | **Confirm the two unconfirmed co-authors, or cut their verticals from v1** (D-3). | Commercial lead (@GTM) | Scope certainty before outline lock. |
|
||
| 0.6 | Open the claims register; assign a post-campaign renewal owner. | Product + Commercial | Truth-in-claims gate; don't leave renewal unstaffed. |
|
||
| 0.7 | Set up the Kickstarter creator account + identity verification. | Campaign lead (@THY) | Long lead time; do it early. |
|
||
|
||
**✅ Gate 0 — decisions closed.** **Pricing spine signed ($47/yr; writers on contract)** · **targets ratified (2026-08-29)** · Minimum Lovable
|
||
Library scoped with authors · **domain renewed (2026-08-31)** · claims register open. *Until the library has named authors and D-3 is closed, don't treat content as on track. Copy freeze still waits on claims + co-author scope.*
|
||
|
||
---
|
||
|
||
## Phase 1 — Build (the ~3 weeks before launch)
|
||
|
||
Organized by the four workstreams. **The content workstream is the critical path** — a beautiful
|
||
campaign around an empty library fails.
|
||
|
||
### 1A · Content — seed the Minimum Lovable Library (critical path)
|
||
| Task | Owner |
|
||
|:--|:--|
|
||
| Lock the chapter outline (chapters per vertical, a named owner each). Blank is [`workflows/chapter-structure.md`](workflows/chapter-structure.md) | Co-authors |
|
||
| Review and freeze the chapter blank, then 3 filled examples | Product + authors |
|
||
| **Seed the Minimum Lovable Library to its floor number** (team + co-authors write & test the workflows) | Co-authors + team |
|
||
| 3 "clone-and-run" kits, each **verified by actually running it** | Dev + QA support |
|
||
| 2 sample chapters (the backer preview) | Two lead co-authors |
|
||
| Contributor onboarding doc + affiliate signup path | Product + Commercial |
|
||
| Structured/versioned content format (so editions diff cleanly, and agents can read it later) | Format support |
|
||
|
||
### 1B · Site & domain
|
||
| Task | Owner |
|
||
|:--|:--|
|
||
| Review the staged landing-page proof-of-concept → feedback | Product + Commercial |
|
||
| Push landing to production (**only after Gate 0**) — working HTTPS, analytics continuity | Site admin (@GTM) |
|
||
| Landing page runs as a **hook A/B test** ("run a workflow today" vs. "own a community guide") — learn which message converts before spending ad budget | Site admin + Product |
|
||
| Affiliates page + Kickbooster widget | Commercial |
|
||
| Email-gated sample-chapter download flow | Email lead (@LDC) + Site admin |
|
||
| **09-12 infra freeze** — DNS/SSL/registrar untouched after this date | All |
|
||
|
||
### 1C · Campaign assets
|
||
| Task | Owner |
|
||
|:--|:--|
|
||
| Kickstarter page copy (all sections, 9/26 dates) | Campaign lead + exec co-author |
|
||
| **Copy freeze** (price already signed: $47/yr, writers on contract; still freeze claims + NFT scrub) | Commercial lead (sign) |
|
||
| **No-crypto scrub gate on every asset** (translation table) | Campaign lead (owner) |
|
||
| Hero video: script → shoot → edit (2–3 min) | Creative lead (@LFG) + co-authors |
|
||
| Cover design + 3D mockups | Creative lead |
|
||
| Pre-launch email sequence (3 emails) built + tagged | Exec co-author + Email lead |
|
||
| LinkedIn organic pre-launch calendar | Creative lead |
|
||
|
||
### 1D · Community & the learning loop
|
||
| Task | Owner |
|
||
|:--|:--|
|
||
| Try-it feedback loop live in the community channel (pinned template) | Product |
|
||
| Book Circles playbook (1 page) + pilot cohort announced | Product + community |
|
||
| Affiliate program live: Kickbooster account, rates set, co-authors invited | Commercial |
|
||
| Workflow-of-the-Week showcase format + first few episodes planned | Product + WeOwn.FM |
|
||
|
||
**✅ Gate 1 — ready to rehearse.** Minimum Lovable Library seeded to its floor · site live with
|
||
working HTTPS · Kickstarter copy frozen · no-crypto scrub passed · pre-launch list on track to
|
||
500 · claims register current.
|
||
|
||
---
|
||
|
||
## Phase 2 — Launch rehearsal (the final week)
|
||
|
||
| Task | Owner |
|
||
|:--|:--|
|
||
| Full dry run: page live, access-key flow tested, all tracking + affiliate links, test email send | Exec co-author + Commercial |
|
||
| Day-1 playbook refreshed (hour-by-hour, 6am→9pm) | Exec co-author |
|
||
| Risk sweep: re-read the risk register against current reality | Product |
|
||
| Final pre-launch list push (target 500) | All |
|
||
| Final claims pass — no draft/open figure on any surface | Product |
|
||
|
||
**✅ Gate 2 — all green → LAUNCH 9/26/2026.**
|
||
|
||
---
|
||
|
||
## Phase 3 — Campaign (~33 days)
|
||
|
||
The standard Kickstarter arc:
|
||
- **Day 1 (09-26):** live at 6am · launch email · all-team social · hourly backer monitoring ·
|
||
Day-1 goal ~30% funded + 100 backers.
|
||
- **Week 1:** reply to every comment within ~2h · early-bird urgency (cap 200) · "FUNDED in X
|
||
days" moment at $5K.
|
||
- **Week 2 (ads on):** LinkedIn A/B (3 creatives) → scale the winner · Meta retargeting · mid
|
||
emails.
|
||
- **Week 3 (mid-push):** anti-dead-zone tactics — signed/personalized tier, stretch-goal
|
||
announcements, guest posts, press, a live Workflow-of-the-Week episode.
|
||
- **Final 48h:** 24h / 3h / final-call emails.
|
||
- **Weekly ritual:** metrics vs. targets + a claims check; feed learnings into steering.
|
||
|
||
**✅ Gate 3 — campaign close.** ≥$5K minimum (mandatory) · report vs. $35K/$54K · affiliate share
|
||
vs. 20% target · begin the handoff of backers into the ecosystem funnel. *(Remember: hitting the
|
||
$5K floor proves people will pre-order — it does not prove renewal or contribution. Read the
|
||
product-health numbers with equal weight.)*
|
||
|
||
---
|
||
|
||
## Phase 4 — Fulfillment & the living book (post-campaign → 2027)
|
||
|
||
| # | Milestone | Target |
|
||
|:--|:--|:--|
|
||
| 4.1 | Campaign final update + backer emails (funded / what's next) | +48h |
|
||
| 4.2 | Manuscript complete (all verticals) | ~Day 60 |
|
||
| 4.3 | Professional editing | ~Day 75 |
|
||
| 4.4 | Layout + design | ~Day 85 |
|
||
| 4.5 | Final proof | ~Day 90 |
|
||
| 4.6 | Print run (hardcopy upcharge) | ~Day 95 |
|
||
| 4.7 | Digital access keys issued (ledger + email; content format finalized) | ~Day 100 |
|
||
| 4.8 | Signed hardcopies shipped | ~Day 110 |
|
||
| 4.9 | All rewards fulfilled | ~Day 120 |
|
||
| 4.10 | **Subscription renewal system live** (year-2 $47/yr; lifetime honored per D-1) | Day 120+ |
|
||
| 4.11 | **Open contribution live** — with a real incentive (per D-2), *now* that the library exists | Day 120+ |
|
||
| 4.12 | Book Circles scale (pilot → several vertical cohorts); showcase becomes a regular series | 2027 Q1 |
|
||
| 4.13 | **Annual edition v1.1** (changelog; the "stays current" promise honored) | 2027 Q1 |
|
||
| 4.14 | Year-1 renewal cohort tracked against the 60% target | 2027 Q4 |
|
||
| 4.15 | Decide whether to build the standalone platform; funnel operational | 2027 Q2 |
|
||
|
||
> Note: the source plan's "NFT minting" step becomes, publicly, **"digital access key
|
||
> issuance."** Same fulfillment, no-crypto framing.
|
||
|
||
---
|
||
|
||
## Budget (planning baseline — reforecast at Gate 1)
|
||
|
||
| Item | Cost |
|
||
|:--|:--|
|
||
| LinkedIn ads (campaign wks 2–4) | $1,300 |
|
||
| Meta ads | $700 |
|
||
| Google ads | $280 |
|
||
| Cover / video edit | $0–500 |
|
||
| Kickstarter fees (~8% on $35K) | ~$2,800 |
|
||
| Kickbooster (~10% on referred pledges) | ~$700 |
|
||
| Domain renewal | ~$15–20 |
|
||
| **Pre-revenue total** | **~$6,000** |
|
||
| Projected revenue | $35,000–$54,000 |
|
||
| Projected net | ~$28,500–$48,000 |
|
||
|
||
---
|
||
|
||
## Who owns what
|
||
|
||
Plain roles, with the internal handle in parentheses for traceability.
|
||
|
||
| Workstream | Lead | Support |
|
||
|:--|:--|:--|
|
||
| Commercial + pricing sign-offs (D-1/D-2, domain) | Commercial lead (@GTM) | Campaign lead (@THY) |
|
||
| Campaign page, account, launch ops | Campaign lead (@THY) | Exec co-author (@CEO), Creative (@LFG) |
|
||
| Content & curation (incl. the Minimum Lovable Library) | Lead co-authors (@THY + @CEO) | Contributors, Product (template), dev/QA (kits) |
|
||
| Site / domain / affiliate tech | Site admin (@GTM) | Email lead (@LDC), dev (staged POC) |
|
||
| Email / CRM | Email lead (@LDC) | Exec co-author (copy) |
|
||
| Creative (cover / video / social) | Creative lead (@LFG) | All |
|
||
| Community & learning loop (Circles, showcase) | Product (@pat) | Community channel, design support |
|
||
| **Spec / PRD / metrics / claims governance** | **Product (@pat)** | Format & governance support |
|
||
|
||
---
|
||
|
||
## Dependencies in one line
|
||
Renew domain (now) → push site → pre-launch list + affiliate live · Decide pricing (this week) →
|
||
freeze copy → submit to Kickstarter · Seed the library + sample chapters → hero video + backer
|
||
preview → launch 9/26.
|
||
|
||
## Review loop
|
||
Living artifact. Each week (post-metrics): Product updates this plan with actual dates and
|
||
owners; the team reviews; deviations are noted here. Keep the claims register and content-format
|
||
conformance current as you go.
|
||
|
||
---
|
||
|
||
## Appendix — What changed in this revision
|
||
|
||
A plain-language rewrite with the product review folded in:
|
||
|
||
1. **Re-sorted around the core loop and the content risk.** The old "Phase 0 decisions" now open
|
||
with renewing the domain and seeding the **Minimum Lovable Library** — the two things most
|
||
likely to sink the launch — instead of a flat list of governance gates.
|
||
2. **Domain is a same-day chore, not a gated decision** (task 0.1).
|
||
3. **Added the Minimum Lovable Library as an explicit Phase-1 gate** — a beautiful campaign
|
||
around an empty library fails.
|
||
4. **Landing page is now a hook A/B test**, not just an email-capture gate — learn which message
|
||
converts before spending ad budget.
|
||
5. **Paid contribution (D-2) is on the critical path**, and "open contribution" in Phase 4 is
|
||
explicitly tied to having a real incentive.
|
||
6. **Product-health metrics get equal weight** at campaign close — "funded" isn't "validated."
|
||
7. **Governance ceremony trimmed** to the two gates that matter (no-crypto scrub, truth in
|
||
claims).
|
||
8. **Jargon translated out** — internal seat/role codes and merge-history removed; owners shown
|
||
as plain roles with handles kept for traceability.
|