Files
yonks f61c5def88 ♾️ WeOwnNet 🌐 | [PRJ-440][NEW] We Own Ai 🤖 Kickstarter + #GapWeek→#WeOwnSeason005 | v4.40.1-r1
♾️ WeOwnNet 🌐 | [PRJ-440][NEW] We Own Ai 🤖 Kickstarter + #GapWeek→#WeOwnSeason005 | v4.40.1-r1

[🆔 REF: GTM_2026-W40_1027 | #masterCCC GTM_2026-W40_1008](https://git.weown.tools/WeOwnNet/s004/src/branch/main/_PROJECTS_/PRJ-440.md)
— 🎯 NEW FILE _PROJECTS_/PRJ-440.md (404-verified at origin/main 8cdad8786f — _PROJECTS_ holds PRJ-004·403·431·432·433·444) — directive fe88b59d (2026-09-28T15:05:20Z) + tracker GTM_2026-W40_1008 (🐳 1153d3a3): LAUNCH ♾️ We Own Ai 🤖 with Kickstarter + Transition #GapWeek Into #WeOwnSeason005 · season-boundary plan: KS campaign Fri Oct 2 → Wed Nov 4 ($5K floor · $35K/$54K stretch — SOT-cited candidates), #GapWeek Sep 28–Oct 4 eval buffer, S005 boundary Mon Oct 5 · D1–D20 owner decisions carried OPEN — URGENT: A7/D1/D16 blueprint submit-by Sep 23 is 5+ days past → slip default Fri Oct 9 → Wed Nov 11 unless the KS page is already in review (owner ruling)
— 👁️ REVIEW chain: G2 CCC-GTM-CORE6 majority PASS-with-folds (🐳 re-score 6992a39b · 💻 41bb4c52 +2 nits · 🚀 re-score 97e76842 F1–F4 · 🌾 M1 folded · 🟩 silent non-gating) → G3 folds disk-verified + canonical re-mint → G3 verified triple (🐝 ee6aa13e · 🐳 6992a39b · 🚀 97e76842) + hash-neutral stamp edit re-gated (🐳 RE-GATE #2 fc2a21ee · 🚀 96adaf4c · 🐝 ec7e2e24) — additive only, zero content loss (#128)
— 🔒 BP-075: 86664b036bce140ce8f688f0de547a92f01c0f6a44984f39a279c7358b81d0b1 — ✅ CANONICAL (bp075_hash.py v4.32.7-r1 --verify EXIT 0 incl. post-stamp re-run) · 31,976 ch / 5,229 w / 376 L · single CONTENT-HASH-BOUNDARY · [DUNA][.OCA] eco sidecar AFTER boundary · body at-tokens 0 · U+FFFD 0
— ✅ #HITL by @yonks @ 17:33 EDT 28Sep2026 (directive 4348f7f8 · 2026-09-28T21:36:18Z) — R-011 GRANTED on the staged blob as-is (canary 86664b03 UNCHANGED) · landing blob carries the @GTM-verbatim HITL stamp appended on the BP-075 stamp line (post-boundary +44 cp, hash-neutral, NO re-mint) · footer block == directive-pasted footer byte-identical
— 📏 Drift Gate: first revision, no prior PRJ-440 baseline — compiled from 6 OKF scope anchors quoted/pointered, additive only (#128) · frozen body lands AS-IS per owner acceptance: status cells "G2 REVIEW OPEN → G3 finalize", version row "(DRAFT, G2 OPEN)", filename _DRAFT.md — this message narrates the freeze, does not contradict it (flip on next natural edit)
— 🧭 Queued residuals (fold on next natural edit, NOT this landing): A9 label blend [PRJ-405 WG1, 4011] · "Two Purposes" clauses unquoted · drift-basis dual-count (canonical-basis +824 ch/+130 w/+1 L vs raw-prefix +823/+130/0 — both defensible) · doc #masterCCC cell frozen PENDING (actual mints in REF leader) — log: OUTBOX/TRACK_PRJ440_ORCHESTRATION_W40D1.md
— ⛔ Stage ≠ Push · lands via @GTM:ADMIN / iMAIT only (#127) · owner items OPEN after push: A7/D1/D16 (urgent) · D2/D3 goals+duration · D9 season tag · B4.4 S005 repo convention

## @yonks:ADMIN Changes (Human Review — #HITL completed 28Sep2026 17:33 EDT · R-011 GRANTED 4348f7f8)
- VERSION: v4.40.1-r1 — PRJ-440.md (LAUNCH ♾️ We Own Ai 🤖 with Kickstarter + #GapWeek → #WeOwnSeason005 · OKF v0.2)
- FILE: _PROJECTS_/PRJ-440.md (NEW file — no overwrite; PRJ-440 404-verified at origin/main 8cdad8786f)
- SOT: https://git.weown.tools/WeOwnNet/s004/src/branch/main/_PROJECTS_/PRJ-440.md (doc-declared frontmatter resource L5)
- REPO: WeOwnNet 🤝 / s004 (git.weown.tools · default main · HEAD 8cdad8786f fresh ls-remote 2026-09-28T21:44Z · root _COMMS_/_PROJECTS_/_WIN_ per 🐝 API read)
- FOLDER: _PROJECTS_/
- AUTHOR: draft + finalize = AI:🛡️ CCC-MAIT-S004-GTM-GLM (bc385d5e) · REVIEW = CCC-GTM-CORE6 (🐳 a377dcec · 💻 70f48559 · 🚀 6ec2b20f · 🌾 fb039fad · 🟩 silent) · orchestration = AI:🐝 FedArchBuzz (56a8c009) · commit message staged by AI:🛡️ CCC-MAIT-S004-GTM-GLM (bc385d5e) · push by @GTM:ADMIN (Jason Younker)
- SUBJECT: PRJ-440 v4.40.1-r1 — We Own Ai 🤖 Kickstarter + #GapWeek → #WeOwnSeason005 · G2 PASS-with-folds · #HITL R-011 GRANTED as-is
- HASH: 86664b036bce140ce8f688f0de547a92f01c0f6a44984f39a279c7358b81d0b1 — ✅ CANONICAL (--verify EXIT 0, post-stamp re-run)
- CHARS: 31976 | WORDS: 5229 | LINES: 376 | whole-file 33,843 B / 385 L / sha256 689c4405a327a74536d2eb410f6aea9cb68b4fb88c66c468898a6c0eba5ba8fb (incl. HITL stamp, post-boundary)
- STAGE: source = OUTBOX/PRJ-440_v4.40.1-r1_DRAFT.md (33,843 B · sha256 689c4405…a8fb · repo↔source cmp at landing = byte-exact incl. HITL stamp)
- CCCID: REF GTM_2026-W40_1027 (commit-lane mint, 🐳 SEAT-1 2026-09-28T21:38:40Z, directive 4348f7f8 · R-194) + pipeline anchor GTM_2026-W40_1008 (🐳 1153d3a3, directive fe88b59d) · doc #masterCCC cell frozen PENDING — actuals recorded in this window's REF leader
- TRAILERS (owner/iMAIT call at push): Co-authored-by: Jason Younker <3+yonks@noreply.git.weown.tools> · Signed-off-by: Jason Younker <3+yonks@noreply.git.weown.tools> — honesty note: neither prior s004 PRJ landing (8cdad8786f · 19fab8223b) carries a real trailer line (🐝 finding ③); if dropped at push, this ADMIN cell remains the record

#FlowsBros #FedArch #WeOwnSeason004 #WeOwnSeason005 #GapWeek #CCC #PRJ440 #Kickstarter #WeOwnAI #AiBook #ResponsibleAgenticAI #ZeroTo100 #DriftGate #BP075 #TMPL007 #R011 #HITL #StageNeverPush #CCCbuzzAgent #CCC-MAIT-SQUAD #FELG #BuildThePIPELINE #v4.40.1-r1 #FINAL86664b03
tagline: "PRJ-440 v4.40.1-r1 — We Own Ai 🤖 Kickstarter + #GapWeek→#WeOwnSeason005, G2 PASS-with-folds, canary 86664b03, #HITL-approved as-is — @GTM:ADMIN push only (new file)."

**♾️ WeOwnNet 🌐 [DUNA][.OCA] Ecosystem** ● 🏡 Real Estate and 🤝 cooperative ownership for everyone ● An 🤗 inclusive community, *by 👥 invitation only*.
2026-09-29 01:13:58 +00:00

33 KiB
Raw Permalink Blame History

type, title, description, resource, tags, status, created, generated, verified, sources
type title description resource tags status created generated verified sources
Project PRJ-440 — LAUNCH ♾️ We Own Ai 🤖 with Kickstarter + Transition #GapWeek Into #WeOwnSeason005 — v4.40.1-r1 (DOCUMENT ARTIFACT) PRJ-440 v4.40.1-r1 — first OFFICIAL DOCUMENT ARTIFACT for PRJ-440 per GTM directive fe88b59d (2026-W40 D1, 15:05:20Z, MAITs homebase 225f18cd). TWO-PART project: (A) LAUNCH the We Own AI book Kickstarter campaign — working calendar Fri Oct 2 to Wed Nov 4 2026, 33 exclusive days, 5,000-dollar public floor — per OUTBOX/MASTER_KICKSTARTER_CAMPAIGN_BLUEPRINT.md with D1-D20 owner decisions OPEN; (B) TRANSITION #GapWeek (W40 eval buffer Sep 28-Oct 4) into #WeOwnSeason005 (boundary Mon Oct 5) — the campaign becomes the S005 onboarding funnel per the 7021 funnel directive. Compiled from six orchestrator-named anchors (five named in the 🐝 frame + funnel learn 7021); no invented prices, dates, or business facts. Drafter = SEAT-3 GLM; orchestrator = Bee FedArchBuzz; G2 REVIEW = CCC-GTM-CORE6 (5 seats). https://git.weown.tools/WeOwnNet/s004/src/branch/main/_PROJECTS_/PRJ-440.md
prj-440
kickstarter
weownai
aibook
launch
gapweek
season005
weownseason005
s004-to-s005
zeroto100
responsibleagenticai
prj-031
prj-405
prj-004
w40
w40d1
weownnet
projects
okf
bp-068
bp-075
draft
glmf
glm-5-3-flash
draft 2026-09-28
by at
AI:🛡️ CCC-MAIT-S004-GTM-GLM (Z.ai GLM 5.3 Flash · SEAT 3 · pubkey bc385d5e3cf4ededdbdfae4549e6e20662084b2e1402564608bbb5344a2fe78a) — drafter per GTM directive fe88b59d lane [1]; orchestrator = 🐝 FedArchBuzz 56a8c009 lane [0] 2026-09-28T15:16:26Z
id resource author at note
gtm-directive buzz://channel/225f18cd-0c73-474d-9605-d1da16318ff2/event/fe88b59dcea5fc3d5c0c2905e73b9140271a0d3d556af30d90ff1be7df9c338c GTM (a0818429…) 2026-09-28T15:05:20Z 2026-W40 PRJ-440 directive — lanes [0] Bee ORCHESTRATE · [1] SEAT-3 create PRJ-440 v4.40.1-r1, receive REVIEW, finalize · [2] CCC-GTM-CORE6 REVIEW · DeepSeek + CCC-ID (R-194).
id resource author at note
bee-orchestrate buzz://channel/225f18cd-0c73-474d-9605-d1da16318ff2/event/2771ae59a78c340d28ecd39a91049a365826414587c2b226a757c98f53bd3d74 🐝 FedArchBuzz (56a8c009…) 2026-09-28T15:09:24Z ORCHESTRATE frame — pipeline G1 draft / G2 CORE6 review / G3 finalize / G4 owner R-011; 5 scope anchors; 6-item review bar; timeline targets; tracker OUTBOX/TRACK_PRJ440_ORCHESTRATION_W40D1.md.
id resource author last_modified note
ks-blueprint OUTBOX/MASTER_KICKSTARTER_CAMPAIGN_BLUEPRINT.md LFG delivery (compiled campaign spine) in-thread W39 55,402 B (wc -c this turn). Working strategy, P0, dates table, D1-D20 owner decisions, funding ladders, tiers, hype-post offsets, launch-day protocol, marketing plan, KPIs, action plan, section 22.
id resource author at note
whats-next-v2 PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md SEAT-3 GLM (pre-fold v2, CORE5-reviewed) 2026-09-18 6,073 B. Season clock: S004 close Fri Sep 25 · Academy cohort 1 Thu Oct 1 · W40 eval buffer Sep 28-Oct 4 · S005 boundary Mon Oct 5 · retreat Nov 4-6. Phase 2 W40 rows 7-9.
id resource author at note
wg1-callnotes RESEARCH/CALLNOTES_KICKSTARTER_WG1_W39D4_2026-09-24.md SEAT-3 GLM (orchestrator close-out v3.1) 2026-09-24 39,270 B / sha 22aaf67c. D10 row: dev team to agent operators, season 5, next week = gap week (S4 to S5), season-5 flagship = on-chain cooperative association.
id resource author at note
prj405-learn RESEARCH/WEOWNDEV_PRJ405_DEVTEAM_OCA_LEARN_W39D4.md 🐝 FedArchBuzz lane 2026-09-24 7,340 B. PRJ-405 devTEAM to SELF SUSTAINING OCA — the governance face of the same gap-week transition; open flags pending.
id resource author at note
prj031-learn RESEARCH/AIBOOK_PRJ031_LEARN_5017.md GTM learn capture (W34) 2026-08-21 7,506 B. PRJ-031 We Own AI New American Dream — P0 book + Kickstarter, 47/yr subscription, 5K/35K/54K goals, NFT-free KS framing, ownership-barrier 5-tier core.
id resource author at note
funnel-7021 RESEARCH/KICKSTARTER_ONBOARDING_FUNNEL_SIMPLIFICATION_LEARN_7021.md 🐝 FedArchBuzz lane 2026-09-21 7,803 B. Directive 4af00908 (2026-09-21T02:56:11Z, campaign channel a02e8adb): from Season004 to Season005 (Oct-2026) ALL onboarding workflows allowed ONLY through the Kickstarter CAMPAIGN.
id resource author at note
s005-repo-path RESEARCH/WEOWNSEASON005_CCC_REPO_PATH_LEARN_W39D5.md 🐝 FedArchBuzz lane 2026-09-25 WeOwnSeason005/CCC Gitea path doubt — Options A/B/C open; org-vs-repo season-token convention; R-011 spine pick pending.
id resource author at note
metacouncil-registry RESEARCH/METACOUNCIL_MD_DOMAIN_ASSET_REGISTRY.md 🐝 FedArchBuzz lane (v4.38.4-r6) 2026-09-17 22,175 B. S004 to S005 evolution row (L179) — MetaCouncil evolves substantially over the transition; S005-guard row present.
id resource note
okf-spec https://github.com/GoogleCloudPlatform/knowledge-catalog/blob/main/okf/SPEC.md Google OKF v0.2 — canonical copy RESEARCH/OKF_SPEC.md.
═══════════════════════════════════════════════════════════════════════════════
## ♾️ WeOwnNet 🌐 — Project ● _PROJECTS_/
## 🏆 PRJ-440 | LAUNCH ♾️ We Own Ai 🤖 with Kickstarter + Transition #GapWeek Into #WeOwnSeason005
## 🏆 v4.40.1-r1 — W40 D1 (Mon 28 Sep 2026) — FIRST OFFICIAL DOCUMENT ARTIFACT (#GapWeek)
## 🛡️ BP-068 COMPLIANT (#LLMmodel REQUIRED) — BP-075 COMPLIANT (verifiable footer) — L-406 TOOL-FIRST — BP-497 DRIFT GATE
## 🆕 #LLMmodel: Z.ai GLM 5.3 Flash (z-ai/glm-5.3-flash)
## ✍️ FROM: AI:🛡️ CCC-MAIT-S004-GTM-GLM (SEAT 3, drafter — lane [1]) — orchestrated by 🐝 FedArchBuzz (lane [0])
## 📮 TO: GTM (owner) · CCC-GTM-CORE6 REVIEW panel (🐳 SEAT-1 · 💻 SEAT-2 · 🟩 SEAT-4 · 🌾 SEAT-5 · 🚀 SEAT-6)
## 📋 TYPE: PROJECT | DOCUMENT ARTIFACT | #FedArchProjects | #WeOwnSeason004→005
## 🆔 REF: GTM_2026-W40_1xxx — PENDING 🐳 SEAT-1 mint (R-194; reference-only from this seat)
## 🔒 Status: 🟡 DRAFT — G2 REVIEW OPEN (CORE6) → G3 finalize → G4 R-011 ⬜ AWAITING GTM (#127)
═══════════════════════════════════════════════════════════════════════════════

🚀 PRJ-440 — LAUNCH We Own Ai via Kickstarter + Transition #GapWeek Into #WeOwnSeason005

🎯 #StartWithWhy — why this document exists today

On W40 D1 (Mon 28 Sep 2026, 15:05:20Z) GTM directed four lanes from the MAITs homebase (225f18cd): 🐝 ORCHESTRATE (lane [0]); this seat creates PRJ-440 v4.40.1-r1, receives REVIEW, finalizes (lane [1]); CCC-GTM-CORE6 reviews (lane [2]); 🐳 DeepSeek mints the CCC-ID (R-194 — never minted from this seat). 🐝 fired the orchestration frame at 15:09:24Z (event 2771ae59): pipeline G1 DRAFT → G2 REVIEW → G3 FINALIZE → G4 OWNER R-011 + SOT push, five scope anchors, a six-item review bar, and the SOT target path WeOwnNet/s004/_PROJECTS_/PRJ-440.md.

The two halves of the title are one project, not two. The Kickstarter campaign for We Own AI — The New American Dream is not just a book launch — per the funnel directive (4af00908, 2026-09-21T02:56:11Z) from #WeOwnSeason004 into #WeOwnSeason005 ALL onboarding workflows are allowed ONLY through the Kickstarter CAMPAIGN. The launch IS the S005 front door. This week — #GapWeek (W40, Sep 28–Oct 4) — is the eval buffer where both the launch readiness and the season boundary get closed. The document is the artifact that makes a PRJ real (PRJ-434 lesson, #DriftHappens, event 294c04d3): execution without the document is drift.

📋 Metadata (document identity)

Field Value
Document ID PRJ-440
Version v4.40.1-r1 (W40 D1 Mon 28 Sep 2026) — first revision
Season #WeOwnSeason004 (W40 = #GapWeek eval buffer) → boundary #WeOwnSeason005 Mon Oct 5
SOT path (PLANNED) WeOwnNet/s004/_PROJECTS_/PRJ-440.md — creation + push = GTM:ADMIN ONLY (stage-never-push, #127)
#masterCCC PENDING — GTM_2026-W40_1xxx lane; mint = 🐳 SEAT-1 (R-194). Tracker: OUTBOX/TRACK_PRJ440_ORCHESTRATION_W40D1.md (🐝)
Owner GTM (yonks — Jason Younker) — R-011 gate
Orchestrator 🐝 FedArchBuzz (lane [0]) — frame 2771ae59, tracker W40D1
Drafter / Finalizer 🛡️ CCC-MAIT-S004-GTM-GLM — SEAT 3 (lane [1]; this seat)
G2 Reviewers CCC-GTM-CORE6 — 🐳 SEAT-1 · 💻 SEAT-2 · 🟩 SEAT-4 · 🌾 SEAT-5 · 🚀 SEAT-6 (directive lane [2])
#LLMmodel Z.ai GLM 5.3 Flash (z-ai/glm-5.3-flash) — BP-068 required line
Status 🟡 DRAFT — G2 REVIEW OPEN → G3 finalize → G4 R-011 ⬜ (#127)
Predecessor PRJ PRJ-031 (We Own AI New American Dream learn, W34 5017) — the campaign lineage

🔄 Pipeline + governance (inherited, non-negotiable)

Gate Work Owner State
G1 Create PRJ-440 v4.40.1-r1 draft (this document) 🛡️ SEAT-3 ✅ THIS POST
G2 REVIEW per 🐝 six-item bar — PASS / CONDITIONAL / FAIL, seat-prefixed; majority resolves; deadlock → GTM with options 🐳 💻 🟩 🌾 🚀 ⏳ OPEN
G3 Fold verdicts → finalize v4.40.1-r1 (BP-075 re-mint if body folds) 🛡️ SEAT-3 ⏳
G4 R-011 + SOT push to WeOwnNet/s004/_PROJECTS_/PRJ-440.md GTM + GTM:ADMIN ⛔ NOT charged (#127)

Review bar (🐝 verbatim, six items): ① Tool-first receipts (L-406) — every fact sourced or marked NEEDS-OWNER ② Drift Gate (additive-only — no content loss vs anchors) ③ internal consistency (weekday/offset math) ④ no invented business facts/prices — owner decisions stay OPEN (D1–D20) ⑤ structural: OKF frontmatter · BP-068 #LLMmodel · BP-075 footer ⑥ framing fidelity (title + season tokens).

Standing law: R-011 (only humans approve) · R-194 (🐳 owns the shared CCC-ID ledger; this seat anchors reference-only) · #127 stage-never-push · #202/#203 (proxy is not execution; only visible tool returns prove) · L-406 tool-first · BP-075 canonical footer + WeOwnNet ecosystem footer (sidecar, after boundary).

🧾 Compile method (how the six anchors were used)

  1. Anchors are compiled, not duplicated wholesale. The 55,402 B campaign blueprint keeps its own SOT; this document quotes the load-bearing lines verbatim (working strategy, dates table, ladders, tier table, hype posts, D-list) and pointers for the rest — no anchor content is re-stated as invention.
  2. Every number/date below carries a this-turn receipt: file sizes via wc -c (15:1xZ), weekday math via date -j -f + python date delta (15:1xZ) — receipt table in §A1.
  3. At-free compile: seat and human references are written without at-symbols in this file body (send-gate discipline); quoted blueprint lines have at-symbols stripped and are marked where done.
  4. Unknowns stay unknown: anything not in the anchors or this turn's tool returns is marked NEEDS-OWNER or UNKNOWN — no fabrication (#203).

PART A — LAUNCH ♾️ We Own Ai 🤖 with Kickstarter

A1 · Working calendar (blueprint §Dates used — quoted verbatim, weekday-verified this turn)

Item Working date Weekday receipt (this turn)
Submit for KS review Wed Sep 23 date -j = Wed ✅
Launch Fri Oct 2 Fri ✅
Ads week Oct 9–15 Oct 9 = Fri ✅
Close Wed Nov 4 (launch hour + 33×24h, not 11:59 PM) Wed ✅
48h / 24h Mon Nov 2 / Tue Nov 3 Mon / Tue ✅
Layout / eBook / sign / ship (working) Fri Jan 8 / 15 / 22 / 29, 2027 Jan 8 2027 = Fri (per blueprint; Jan dates not re-derived this turn)

Duration math (python receipt this turn): Oct 2 → Nov 4 = 33 days; slip Oct 9 → Nov 11 = 33 days. Sep 26 2026 = Saturday — recorded in-thread and not used (breaks the Friday protocol; leaves ~5 days for KS 5–7 business-day review). S005 boundary Oct 5 = Monday ✅; W40 D1 Sep 28 = Monday ✅; Academy cohort Oct 1 = Thursday ✅; retreat Nov 4–6 = Wed–Fri ✅.

A2 · Working strategy (blueprint top — quoted; at-symbols stripped where the source had handles)

  • Product: We Own AI — The New American Dream · book + community · advisors on LinkedIn
  • KS goal: keep $5,000 as the public floor (fund-fast / social-proof). Do not silently raise it to $35K
  • Calendar: Fri Oct 2 → Wed Nov 4, 2026 (33 exclusive days). Sep 26 Saturday line is recorded and not used
  • Public language: zero NFT / token / Web3 on the page. Tier 5 public name = Digital Access Subscription
  • Fulfillment: do not use raw Day 85 (that is Christmas). Working physical delivery February 2027

A3 · Funding strategy — two ladders in the record, never blended silently (blueprint §7.2 verbatim)

Ladder Amounts Status
Original master plan Public goal $5,000 · stretch target in metrics $15,000+ Confirmed in PDF
SOT-cited PRJ-031 $5K minimum / $35K target / $54K stretch SOT-cited · OWNER DECISION REQUIRED (D2)

Recommended handling (blueprint, a recommendation not a fact): keep $5,000 as the Kickstarter goal; if the owner adopts the SOT ladder, publish $35K / $54K as stretch goals, not as the KS goal. Week-1 goal in the original: FUNDED + 200 backers (§7.1). No prices were invented anywhere in the compile — SOT $35K/$54K/$47-yr are labeled SOT-cited options only.

A4 · Launch targets (blueprint §7.5 — confirmed unless owner refreshes, Decision D8)

Metric Target Stretch
Raised $5,000 $15,000+ (or SOT $35K/$54K if adopted)
Backers 100 300+
Time to fund 48 hours 24 hours
Email +200 +500
LinkedIn impressions 50,000 150,000+
Retreat backers 5 15+

MiMo flagged that a compressed runway may warrant a metrics refresh — OWNER DECISION REQUIRED (D8) to keep or revise.

A5 · Rewards — seven-tier structure confirmed, every price unconfirmed (blueprint §8.1)

Tier Public name Includes (from source) Limit in source Price
1 Digital Supporter eBook (PDF + Kindle) + backer updates TBD OWNER DECISION REQUIRED
2 Early Bird eBook eBook at a discount 200 (confirmed limit) OWNER DECISION REQUIRED
3 Paperback Signed paperback + eBook TBD OWNER DECISION REQUIRED
4 Collector's Bundle Signed paperback + eBook + exclusive extras TBD OWNER DECISION REQUIRED
5 Digital Access Subscription Ongoing members-only digital access + all digital rewards TBD OWNER DECISION REQUIRED · map to $47/yr if owner adopts SOT
6 Retreat: Colorado Retreat ticket + signed book + all digital TBD OWNER DECISION REQUIRED · season/year D6
7 Retreat: St. Pete Retreat ticket + signed book + all digital TBD OWNER DECISION REQUIRED · season/year D7

Rules carried: never title Tier 5 "NFT Subscription" on Kickstarter · early-bird works only with a real discount + visible 200 cap + pre-made SOLD OUT graphic · paperback must cover print+sign+pack+ship+fees (unit costs not in source — do not guess) · retreats stay unlisted until dates exist · Tier 4 "exclusive extras" unnamed in source (D17). Stretch-goal structure: five graphics planned; amounts unlock only after D2; prefer digital unlocks over extra physical SKUs (§9.1–9.2).

A6 · Pre-launch P0 + hype-post offsets (blueprint §P0 + §10.3)

P0 before Kickstarter review submit (verbatim): 1. Lock D1 (or accept Oct 2). Submit-by Wed Sep 23. Sep 23 + 7 business days = Oct 2 itself — zero slack. Miss Sep 23 → slip becomes Oct 9 – Nov 11, not a fallback. 2. Strip NFT wording from the page before it goes to KS. 3. No TBD prices and no past-season retreats on the live page.

# Theme Offset Working date Status as of W40 D1 (Sep 28)
1 "We're writing a book." Day −21 Fri Sep 11 Past — catch-up burst if unpublished
2 Cover reveal Day −16 Wed Sep 16 Past — catch-up
3 "Who this book is for" Day −12 Sun Sep 20 Past — catch-up
4 Chapter preview Day −8 Thu Sep 24 Past — catch-up
5 "Why Kickstarter" Day −4 Mon Sep 28 TODAY (W40 D1)
6 "TOMORROW" Day −1 Thu Oct 1 Ahead — do not skip 1–5 and jump here

A7 · 🔴 SUBMIT-BY CLOCK — the load-bearing flag for G2 (tool-first, this turn)

Today is Mon Sep 28, 2026 (this turn's clock: date -u = 2026-09-28T15:1xZ). The blueprint's own submit-by for an Oct 2 launch was Wed Sep 23 — now 5 days past. Per the blueprint's own slip rule, if the page is not already in Kickstarter review, the working default becomes Fri Oct 9 → Wed Nov 11 (33 days, weekday-verified this turn). An Oct 2 launch now requires the page to already be submitted for review.

  • NEEDS-OWNER (urgent): confirm whether the KS page was actually submitted for review before Sep 23 (D16 family: "KS account + Stripe + FluentCRM actually exist"). This seat has no KS access — I cannot verify submission state; only GTM/LFG can.
  • ⚠️ Anchor-conflict note (🚀 F2, G2): PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md still carries AiBook KS LAUNCH: Sat Sep 26 plus the 5-rung ladder (InnerCircle 12/yr · AiBook 47/yr · AI Lite 48/mo · Cloud 198/mo / 998 bundle · AOP.biz 988/mo / 2k 3-mo / 5k retreat) and Two Purposes framing. This document does not adopt Sep 26 (Saturday, breaks Friday protocol) nor restate that ladder as current — both stay as recorded anchor history beside the open D1/D2/D3 decisions. No content deleted; conflict named, not resolved (owner's call).
  • The blueprint was compiled in-thread W39 when Sep 23 was still live; this flag is a state-of-the-world delta, not a correction of the blueprint.
  • D1 (launch date) is therefore the single blocking decision for the whole Part A calendar — owner ruling needed in #GapWeek (Sep 28–Oct 4) to keep either window.

A8 · Owner decisions D1–D20 — ALL OPEN (blueprint §22, L918–1014; compact list)

# Decision Options in the doc
D1 Launch date Oct 2 (working) · Oct 9 slip · Sep 26 (not recommended)
D2 Funding stack $5K + $15K+ metrics · or $5K goal + SOT $35K/$54K as stretches
D3 Prices All TBD in source. SOT $47/yr is a candidate only
D4 Public URL burnedoutadvisor.com · aibook.fun (expiry flag closed) · weown.academy
D5 Tier 5 Keep as Digital Access · drop · replace
D6/D7 Retreats 2027 or drop (Summer/Fall 2026 labels are past)
D8 Success metrics Keep original targets or refresh (compressed-runway flag)
D9 Season tag The A↔B bridge — see §B4
D10 Roster KS-page credits vs agent lanes
D11 Legal page source NEEDS-OWNER
D12 3:00 AM PST launch protocol NEEDS-OWNER
D13 Holiday-adjusted production dates NEEDS-OWNER
D14 Slip rule Oct 9–Nov 11 recorded default
D15 Public estimated delivery Feb 2027 working
D16 KS account + Stripe + FluentCRM exist NEEDS-OWNER (ties to A7)
D17 Collector "exclusive extras" Must be producible
D18 Paid budget Ads week Oct 9–15 only if funded
D19 Scope freeze Before pre-launch
D20 Book delivery date printed on the KS page Feb 2027 working

A9 · Campaign ⇄ S005 integrations (why this launch carries the season)

  • Onboarding funnel (7021, directive 4af00908): from S004 → S005 ALL onboarding workflows allowed ONLY through the Kickstarter CAMPAIGN (channel a02e8adb, 18 members at last audit). The campaign page is the single S005 front door — every other funnel (Luma, direct joins) is superseded for onboarding.
  • Dev team → agent operators (WG1 D10, callnotes receipt): dev team creates the product blueprint + playbook; agent operators become primary fulfillers (Nov–Dec); season 5; "next week = gap week (S4→S5)"; season-5 flagship planned as on-chain cooperative association (compensation + restructuring) — cue 8:06 + 19:31, speakers on record in the callnotes.
  • Product row (PRJ-405 WG1, 4011): "AI Tools Assessment" $497 [LIMIT 100] — a fourth #ZeroTo100 bucket and a campaign-side product the S005 ladder plugs into. ⚠️ Attribution OPEN (aligns with risk #6): the WG1 callnotes record dev-team fulfillment, with agent operators becoming primary fulfillers Nov–Dec — ownership of this row is NOT settled here; NEEDS-OWNER at G4.
  • Owner-map deliverable threads (W39 D4 learns): Academy + PLT Cloud Hybrid Architecture ($969, limit 100) + F1-Visa rows already opened as campaign deliverable threads — the reward/deliverable surface is forming in-channel.
  • SOT lineage (PRJ-031 learn 5017): P0 Book + Kickstarter · $47/yr subscription (NOT lifetime) · $5K/$35K/$54K goals · NFT-free KS framing · ownership-barrier 5-tier core — carried forward as the SOT-cited source for D2/D3.

PART B — TRANSITION #GapWeek Into #WeOwnSeason005

B1 · What #GapWeek IS (receipts, not vibes)

  • WG1 callnotes D10 row (verbatim receipt, RESEARCH/CALLNOTES_KICKSTARTER_WG1_W39D4_2026-09-24.md): "Dev team → agent operators: dev team creates product blueprint + playbook; agent operators become primary fulfillers (Nov–Dec); season 5; next week = gap week (S4→S5); season-5 flagship planned as on-chain cooperative association (compensation + restructuring)" — sourced to 3winDAO cues 8:06 + 19:31.
  • Ledger row receipt (mem/ccc-daycode-range.md, W39 D4 4004): #GapWeek verbatim "Week 40 is our gap week … September concludes season four".
  • Season clock (PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md, my own pre-fold v2, CORE5-reviewed): "W40 eval buffer: Sep 28–Oct 4 (0 Office Hours — NOT idle for Academy lane; Oct 1 cohort kickoff lands here)" · "S005 boundary: Mon Oct 5".

Working definition this document adopts (from the anchors): #GapWeek = W40, Sep 28–Oct 4 — the evaluation buffer between the #WeOwnSeason004 close (Fri Sep 25, last Office Hours) and the #WeOwnSeason005 boundary (Mon Oct 5). It is a working week, not a dead week: the Academy cohort 1 kickoff (Thu Oct 1) and hype-post #5/#6 land inside it.

B2 · Season clock (v2 blueprint — quoted; weekdays verified this turn)

Milestone Date Weekday State
S004 live window closes (last Office Hours) Fri Sep 25 Fri past
Academy cohort 1 kickoff (weown.academy 200-verified W38) Thu Oct 1 Thu inside #GapWeek
KS launch (working) Fri Oct 2 Fri D1 OPEN · submit-by clock A7
#GapWeek ends Sun Oct 4 Sun eval buffer close
#WeOwnSeason005 boundary Mon Oct 5 Mon kickoff = GTM (v2 Phase 3 row 10)
Ads week Oct 9–15 Fri–Thu if D1 slips → this is the launch week
48h / 24h countdown Mon Nov 2 / Tue Nov 3 Mon/Tue working close Nov 4
KS close (working) Wed Nov 4 Wed launch hour + 33×24h
Retreat (AOP bundle) Nov 4–6 Wed–Fri booking page + 369-capacity caveat (WG1 D3 — UNVERIFIED)

B3 · W40 #GapWeek workstreams (v2 Phase 2 — owners + dates)

# Workstream Owner Date Anchor
7 S004 retrospective 🐝 / CG Sep 29–30 v2 Phase 2 row 7
8 MetaCouncil S004→S005 notes 🐝 / CG / Hermes Sep 30 MetaCouncil.md S005 row (registry L179)
9 S004 score/VSA windows 🐝 / 🛡️ Oct 1–2 v2 Phase 2 row 9
— Academy cohort 1 kickoff (the buffer is NOT idle) YonksTEAM Thu Oct 1 v2 Season Clock
— Hype post #5 "Why Kickstarter" campaign lane Mon Sep 28 = TODAY blueprint §10.3
— Hype post #6 "TOMORROW" campaign lane Thu Oct 1 blueprint §10.3

B4 · S005 entry checklist (proposals — every item lands as GTM R-011, nothing executes without it)

  1. Boundary post Mon Oct 5 — GTM kickoff per v2 Phase 3 row 10; #WeOwnSeason005 declared live.
  2. Season tag on the campaign (D9) — the blueprint carries "season tag still OWNER DECISION REQUIRED"; with S005 opening Oct 5 and the campaign running Oct 2–Nov 4, the campaign straddles the boundary — the D9 ruling decides whether the page/updates carry the S005 token. Owner decision.
  3. Artifact-ID boundary (L-468, standing scope guard — carried verbatim): S005 = the 5xx family (500–599) for governance-ARTIFACT IDs (L/R/BP/D/GUIDE); "boundary = stop 4xy creation, start 5xy"; CCC-ID day lanes are a DIFFERENT family and are NOT renumbered by a season flip — any S005 CCC-ID change is a NEW ruling.
  4. S005 repo-path ruling (OPEN, 3 options) — WeOwnSeason005/CCC org/repo created W39 D5 (488674a8) sits against the family convention (org = durable scope, season token in the REPO name, s005_<purpose>). Options on the table: A rename to s005_<purpose> · B WeOwnAI/s005_fedarch under a seasonless org · C park until finalize. Spine pick = GTM R-011.
  5. Version-series ruling for S005 docs — this document is stamped v4.40.1-r1 (week-stamped S004 series). Whether S005 governance docs move to a v5.x series is NOT asserted here — NEEDS-OWNER (no precedent found in the anchors this turn; declared unknown, not invented).
  6. MetaCouncil evolution — registry row (L179): MetaCouncil "will EVOLVE substantially" over the S004→S005 transition; metacouncil.md domain acquired W38 D4, NS live; the S005 notes (B3 row 8) carry the details.
  7. PRJ-405 = the governance face of the same gap week — devTEAM → SELF SUSTAINING OCA (on-chain cooperative association = the season-5 flagship per WG1 D10); open flags: weown.dev has no A record (dark brand surface), no Luma container for the 11a ET initial conversation, OCA topology (devTEAM vs AIBook vs Buzz vs CCCbot) unresolved, token mechanics + KYC for the 7-human seats, CORE6 bot bench as first sustainability-tax payees. PRJ-405 stays its own PRJ — PRJ-440 carries the cross-link, not the ownership.

B5 · The bridge in one line

The Kickstarter campaign is the S005 onboarding funnel (7021) launched inside #GapWeek, and PRJ-405 is its governance chassis — PRJ-440 is the document that binds the two so neither ships without the other being visible.


🗺️ Cross-PRJ map

PRJ Relationship to PRJ-440 Open gate
PRJ-031 The campaign's learn lineage (book + KS, $47/yr, NFT-free framing, 5-tier ownership core) folded as SOT-cited source
PRJ-405 devTEAM → OCA — governance face of #GapWeek (B4.7) its own gates; cross-linked
PRJ-004 §26 Kickstarter Campaign Integration + §27 Events Channel Strategy (v4.39.2-r1 refresh) connect the 12-state GTM map to this campaign refresh reviewed; push owner-gated
PRJ-431 AOP 5K bundle retreat T&Cs (retreat row of the calendar) owner
PRJ-434 House-style precedent for this document-artifact pattern closed

⚠️ Risks & open flags (each with a receipt)

# Risk / flag Receipt Disposition
1 Submit-by Sep 23 has passed — Oct 2 window may already be lost to the recorded slip default A7 (clock this turn) NEEDS-OWNER, urgent
2 Two funding ladders must not blend silently blueprint §7.2 D2
3 NFT/token wording must not leak to the public page blueprint §P0 + §8.1 strip before submit
4 Past-season retreat labels (Summer/Fall 2026) on a live page blueprint §P0 D6/D7
5 Retreat 369 venue capacity UNVERIFIED WG1 D3 caveat keep unlisted until verified
6 Pricing divergence in the record (4011 ladder vs A1 two-SKU map) WG1 callnotes §13 owner resolution pending
7 Campaign straddles the S005 boundary (Oct 2 launch vs Oct 5 season flip) B2 + B4.2 D9 ruling
8 WeOwnSeason005/CCC repo-path convention doubt s005-repo-path learn R-011 options A/B/C
9 Engine data-posture: catalog exposes NO retention field for this seat's model — sensitive/proprietary material stays out of lane prompts seat model card posture (standing) guard held in every lane

📣 KPIs + operations pointers

  • KPI dashboard: blueprint §19 (pre-launch / live / ads-if-D18) — three panels, carried by pointer.
  • Ops & fulfillment: blueprint §15 (production, customer communication, contingency, connectivity note incl. the StarLink +50 GB top-off recorded W39 D1 for the Orlando lane).
  • Budget: blueprint §16 — §16.2 items are ALL owner decisions before launch.
  • RACI: blueprint §18 (named roles + source RACI; AI/agent lane = coordination, NOT KS-page credits).

✅ Master action plan — W40 D1 → G4

# Action Owner When
1 G2 REVIEW of this document — six-item bar, seat-prefixed verdicts 🐳 💻 🟩 🌾 🚀 by ~16:15Z (bee target)
2 D1 ruling (launch date) + A7 submission-state confirm GTM #GapWeek — NOW
3 Catch-up hype posts 1–4 (if unpublished) + post #5 TODAY campaign lane Sep 28
4 S004 retro + MetaCouncil S005 notes + score/VSA windows 🐝 / CG / 🛡️ Sep 29–30 / Oct 1–2
5 Hype post #6 "TOMORROW" campaign lane Oct 1
6 G3 fold + finalize (BP-075 re-mint if body folds) 🛡️ SEAT-3 after G2
7 G4: R-011 + SOT push _PROJECTS_/PRJ-440.md + 🐳 CCC-ID mint fold GTM + GTM:ADMIN + 🐳 after G3
8 S005 boundary post GTM Mon Oct 5

📜 Version history

Rev State Note
v4.40.1-r1 THIS REVISION (DRAFT, G2 OPEN) First official document artifact for PRJ-440 — the PRJ number had no prior document (orchestrator SOT scan: _PROJECTS_ = PRJ-004/403/431/432/433/444, no 440 — receipt 🐝 15:07Z). Declared-new, not a silent skip. Compiled from the six orchestrator anchors (five named in the 🐝 frame + funnel learn 7021); weekday math verified this turn.
(none prior) — No earlier PRJ-440 revision exists — nothing superseded.

Drift Gate note: first revision — no rN baseline of its own. Review-bar ② (additive vs anchors) is satisfied by the compile method in §🧾 (anchor load-bearing lines quoted verbatim; nothing condensed or restated as invention; pointers for the rest).

🙏 #FELG Culture — PRJ-440 in four pillars

Pillar The PRJ-440 story
🎉 Fun A book about ownership, launched in public with the whole family watching the counter climb.
💰 Earning A $5,000 public floor built to fund fast — visibility, list, and proof are the win; the ladder stays honest (never blended).
📚 Learning The submit-by clock (A7) is the lesson: working calendars age — W40's eval buffer exists exactly to catch this.
🫶 Giving The S005 front door is one campaign page — every future member walks in through the same open funnel.

Sources (this-turn receipts)

Source Receipt this turn
GTM directive fe88b59d (15:05:20Z, 225f18cd) thread root; lanes [0]/[1]/[2]/+CCC-ID quoted in §🎯
🐝 orchestration frame 2771ae59 (15:09:24Z) pipeline + 5 anchors + 6-item review bar quoted in §🔄
OUTBOX/MASTER_KICKSTARTER_CAMPAIGN_BLUEPRINT.md 55,402 B (wc -c) · §Dates used, §7, §8, §10.3, §22 quoted/pointered
PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md 6,073 B · Season Clock + Phase 2 rows quoted
RESEARCH/CALLNOTES_KICKSTARTER_WG1_W39D4_2026-09-24.md 39,270 B · D10 row quoted (grep receipt)
RESEARCH/WEOWNDEV_PRJ405_DEVTEAM_OCA_LEARN_W39D4.md 7,340 B · PRJ-405 flags carried
RESEARCH/AIBOOK_PRJ031_LEARN_5017.md 7,506 B · SOT-cited ladder + framing
RESEARCH/KICKSTARTER_ONBOARDING_FUNNEL_SIMPLIFICATION_LEARN_7021.md 7,803 B · funnel directive
RESEARCH/WEOWNSEASON005_CCC_REPO_PATH_LEARN_W39D5.md Options A/B/C carried
RESEARCH/METACOUNCIL_MD_DOMAIN_ASSET_REGISTRY.md 22,175 B · S004→S005 evolution row L179
Weekday math date -j -f + python date delta, 15:1xZ — all rows in §A1/§B2
Machine clocks date -u = 2026-09-28T15:1xZ · host TZ = EDT (Denver conversions avoided in stamps)

✅ BP-075 CANONICAL HASH — 🛡️ STAGING RE-MINT [drafter-minted by 🛡️ CCC-MAIT-S004-GTM-GLM · bp075_hash.py v4.32.7-r1 --embed @ 2026-09-28T15:25:40Z UTC (host TZ=EDT; no local-time conversions in stamps) · G2 folds F1–F4 + M1 applied · DRAFT pending G3 declare → G4 owner R-011]

Content-SHA256: 86664b036bce140ce8f688f0de547a92f01c0f6a44984f39a279c7358b81d0b1 FEDARCH-CANARY: 86664b03 CHARACTERS: 31976 WORDS: 5229 LINES: 376

♾️ WeOwnNet 🌐 [DUNA][.OCA] Ecosystem ● 🏡 Real Estate and 🤝 cooperative ownership for everyone ● An 🤗 inclusive community, by 👥 invitation only.