PRJ-440 — LAUNCH ♾️ We Own Ai 🤖 with Kickstarter + Transition #GapWeek Into #WeOwnSeason005 — v4.40.1-r1 (DOCUMENT ARTIFACT)
PRJ-440 v4.40.1-r1 — first OFFICIAL DOCUMENT ARTIFACT for PRJ-440 per GTM directive fe88b59d (2026-W40 D1, 15:05:20Z, MAITs homebase 225f18cd). TWO-PART project: (A) LAUNCH the We Own AI book Kickstarter campaign — working calendar Fri Oct 2 to Wed Nov 4 2026, 33 exclusive days, 5,000-dollar public floor — per OUTBOX/MASTER_KICKSTARTER_CAMPAIGN_BLUEPRINT.md with D1-D20 owner decisions OPEN; (B) TRANSITION #GapWeek (W40 eval buffer Sep 28-Oct 4) into #WeOwnSeason005 (boundary Mon Oct 5) — the campaign becomes the S005 onboarding funnel per the 7021 funnel directive. Compiled from six orchestrator-named anchors (five named in the 🐝 frame + funnel learn 7021); no invented prices, dates, or business facts. Drafter = SEAT-3 GLM; orchestrator = Bee FedArchBuzz; G2 REVIEW = CCC-GTM-CORE6 (5 seats).
39,270 B / sha 22aaf67c. D10 row: dev team to agent operators, season 5, next week = gap week (S4 to S5), season-5 flagship = on-chain cooperative association.
7,340 B. PRJ-405 devTEAM to SELF SUSTAINING OCA — the governance face of the same gap-week transition; open flags pending.
id
resource
author
at
note
prj031-learn
RESEARCH/AIBOOK_PRJ031_LEARN_5017.md
GTM learn capture (W34)
2026-08-21
7,506 B. PRJ-031 We Own AI New American Dream — P0 book + Kickstarter, 47/yr subscription, 5K/35K/54K goals, NFT-free KS framing, ownership-barrier 5-tier core.
7,803 B. Directive 4af00908 (2026-09-21T02:56:11Z, campaign channel a02e8adb): from Season004 to Season005 (Oct-2026) ALL onboarding workflows allowed ONLY through the Kickstarter CAMPAIGN.
🚀 PRJ-440 — LAUNCH We Own Ai via Kickstarter + Transition #GapWeek Into #WeOwnSeason005
🎯 #StartWithWhy — why this document exists today
On W40 D1 (Mon 28 Sep 2026, 15:05:20Z) GTM directed four lanes from the MAITs homebase (225f18cd): 🐝 ORCHESTRATE (lane [0]); this seat creates PRJ-440 v4.40.1-r1, receives REVIEW, finalizes (lane [1]); CCC-GTM-CORE6 reviews (lane [2]); 🐳 DeepSeek mints the CCC-ID (R-194 — never minted from this seat). 🐝 fired the orchestration frame at 15:09:24Z (event 2771ae59): pipeline G1 DRAFT → G2 REVIEW → G3 FINALIZE → G4 OWNER R-011 + SOT push, five scope anchors, a six-item review bar, and the SOT target path WeOwnNet/s004/_PROJECTS_/PRJ-440.md.
The two halves of the title are one project, not two. The Kickstarter campaign for We Own AI — The New American Dream is not just a book launch — per the funnel directive (4af00908, 2026-09-21T02:56:11Z) from #WeOwnSeason004 into #WeOwnSeason005 ALL onboarding workflows are allowed ONLY through the Kickstarter CAMPAIGN. The launch IS the S005 front door. This week — #GapWeek (W40, Sep 28–Oct 4) — is the eval buffer where both the launch readiness and the season boundary get closed. The document is the artifact that makes a PRJ real (PRJ-434 lesson, #DriftHappens, event 294c04d3): execution without the document is drift.
📋 Metadata (document identity)
Field
Value
Document ID
PRJ-440
Version
v4.40.1-r1 (W40 D1 Mon 28 Sep 2026) — first revision
REVIEW per 🐝 six-item bar — PASS / CONDITIONAL / FAIL, seat-prefixed; majority resolves; deadlock → GTM with options
🐳💻🟩🌾🚀
⏳ OPEN
G3
Fold verdicts → finalize v4.40.1-r1 (BP-075 re-mint if body folds)
🛡️ SEAT-3
⏳
G4
R-011 + SOT push to WeOwnNet/s004/_PROJECTS_/PRJ-440.md
GTM + GTM:ADMIN
⛔ NOT charged (#127)
Review bar (🐝 verbatim, six items): ① Tool-first receipts (L-406) — every fact sourced or marked NEEDS-OWNER ② Drift Gate (additive-only — no content loss vs anchors) ③ internal consistency (weekday/offset math) ④ no invented business facts/prices — owner decisions stay OPEN (D1–D20) ⑤ structural: OKF frontmatter · BP-068 #LLMmodel · BP-075 footer ⑥ framing fidelity (title + season tokens).
Standing law: R-011 (only humans approve) · R-194 (🐳 owns the shared CCC-ID ledger; this seat anchors reference-only) · #127 stage-never-push · #202/#203 (proxy is not execution; only visible tool returns prove) · L-406 tool-first · BP-075 canonical footer + WeOwnNet ecosystem footer (sidecar, after boundary).
🧾 Compile method (how the six anchors were used)
Anchors are compiled, not duplicated wholesale. The 55,402 B campaign blueprint keeps its own SOT; this document quotes the load-bearing lines verbatim (working strategy, dates table, ladders, tier table, hype posts, D-list) and pointers for the rest — no anchor content is re-stated as invention.
Every number/date below carries a this-turn receipt: file sizes via wc -c (15:1xZ), weekday math via date -j -f + python date delta (15:1xZ) — receipt table in §A1.
At-free compile: seat and human references are written without at-symbols in this file body (send-gate discipline); quoted blueprint lines have at-symbols stripped and are marked where done.
Unknowns stay unknown: anything not in the anchors or this turn's tool returns is marked NEEDS-OWNER or UNKNOWN — no fabrication (#203).
PART A — LAUNCH ♾️ We Own Ai 🤖 with Kickstarter
A1 · Working calendar (blueprint §Dates used — quoted verbatim, weekday-verified this turn)
Item
Working date
Weekday receipt (this turn)
Submit for KS review
Wed Sep 23
date -j = Wed✅
Launch
Fri Oct 2
Fri✅
Ads week
Oct 9–15
Oct 9 = Fri✅
Close
Wed Nov 4 (launch hour + 33×24h, not 11:59 PM)
Wed✅
48h / 24h
Mon Nov 2 / Tue Nov 3
Mon / Tue✅
Layout / eBook / sign / ship (working)
Fri Jan 8 / 15 / 22 / 29, 2027
Jan 8 2027 = Fri (per blueprint; Jan dates not re-derived this turn)
Duration math (python receipt this turn): Oct 2 → Nov 4 = 33 days; slip Oct 9 → Nov 11 = 33 days. Sep 26 2026 = Saturday — recorded in-thread and not used (breaks the Friday protocol; leaves ~5 days for KS 5–7 business-day review). S005 boundary Oct 5 = Monday ✅; W40 D1 Sep 28 = Monday ✅; Academy cohort Oct 1 = Thursday ✅; retreat Nov 4–6 = Wed–Fri ✅.
A2 · Working strategy (blueprint top — quoted; at-symbols stripped where the source had handles)
Product:We Own AI — The New American Dream · book + community · advisors on LinkedIn
KS goal: keep $5,000 as the public floor (fund-fast / social-proof). Do not silently raise it to $35K
Calendar:Fri Oct 2 → Wed Nov 4, 2026 (33 exclusive days). Sep 26 Saturday line is recorded and not used
Public language: zero NFT / token / Web3 on the page. Tier 5 public name = Digital Access Subscription
Fulfillment: do not use raw Day 85 (that is Christmas). Working physical delivery February 2027
A3 · Funding strategy — two ladders in the record, never blended silently (blueprint §7.2 verbatim)
Ladder
Amounts
Status
Original master plan
Public goal $5,000 · stretch target in metrics $15,000+
Confirmed in PDF
SOT-cited PRJ-031
$5K minimum / $35K target / $54K stretch
SOT-cited · OWNER DECISION REQUIRED (D2)
Recommended handling (blueprint, a recommendation not a fact): keep $5,000 as the Kickstarter goal; if the owner adopts the SOT ladder, publish $35K / $54K as stretch goals, not as the KS goal. Week-1 goal in the original: FUNDED + 200 backers (§7.1). No prices were invented anywhere in the compile — SOT $35K/$54K/$47-yr are labeled SOT-cited options only.
Ongoing members-only digital access + all digital rewards
TBD
OWNER DECISION REQUIRED · map to $47/yr if owner adopts SOT
6
Retreat: Colorado
Retreat ticket + signed book + all digital
TBD
OWNER DECISION REQUIRED · season/year D6
7
Retreat: St. Pete
Retreat ticket + signed book + all digital
TBD
OWNER DECISION REQUIRED · season/year D7
Rules carried: never title Tier 5 "NFT Subscription" on Kickstarter · early-bird works only with a real discount + visible 200 cap + pre-made SOLD OUT graphic · paperback must cover print+sign+pack+ship+fees (unit costs not in source — do not guess) · retreats stay unlisted until dates exist · Tier 4 "exclusive extras" unnamed in source (D17). Stretch-goal structure: five graphics planned; amounts unlock only after D2; prefer digital unlocks over extra physical SKUs (§9.1–9.2).
P0 before Kickstarter review submit (verbatim): 1. Lock D1 (or accept Oct 2). Submit-by Wed Sep 23. Sep 23 + 7 business days = Oct 2 itself — zero slack. Miss Sep 23 → slip becomes Oct 9 – Nov 11, not a fallback. 2. Strip NFT wording from the page before it goes to KS. 3. No TBD prices and no past-season retreats on the live page.
#
Theme
Offset
Working date
Status as of W40 D1 (Sep 28)
1
"We're writing a book."
Day −21
Fri Sep 11
Past — catch-up burst if unpublished
2
Cover reveal
Day −16
Wed Sep 16
Past — catch-up
3
"Who this book is for"
Day −12
Sun Sep 20
Past — catch-up
4
Chapter preview
Day −8
Thu Sep 24
Past — catch-up
5
"Why Kickstarter"
Day −4
Mon Sep 28
TODAY (W40 D1)
6
"TOMORROW"
Day −1
Thu Oct 1
Ahead — do not skip 1–5 and jump here
A7 · 🔴 SUBMIT-BY CLOCK — the load-bearing flag for G2 (tool-first, this turn)
Today is Mon Sep 28, 2026 (this turn's clock: date -u = 2026-09-28T15:1xZ). The blueprint's own submit-by for an Oct 2 launch was Wed Sep 23 — now 5 days past. Per the blueprint's own slip rule, if the page is not already in Kickstarter review, the working default becomes Fri Oct 9 → Wed Nov 11 (33 days, weekday-verified this turn). An Oct 2 launch now requires the page to already be submitted for review.
NEEDS-OWNER (urgent): confirm whether the KS page was actually submitted for review before Sep 23 (D16 family: "KS account + Stripe + FluentCRM actually exist"). This seat has no KS access — I cannot verify submission state; only GTM/LFG can.
⚠️Anchor-conflict note (🚀 F2, G2):PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md still carries AiBook KS LAUNCH: Sat Sep 26 plus the 5-rung ladder (InnerCircle 12/yr · AiBook 47/yr · AI Lite 48/mo · Cloud 198/mo / 998 bundle · AOP.biz 988/mo / 2k 3-mo / 5k retreat) and Two Purposes framing. This document does not adopt Sep 26 (Saturday, breaks Friday protocol) nor restate that ladder as current — both stay as recorded anchor history beside the open D1/D2/D3 decisions. No content deleted; conflict named, not resolved (owner's call).
The blueprint was compiled in-thread W39 when Sep 23 was still live; this flag is a state-of-the-world delta, not a correction of the blueprint.
D1 (launch date) is therefore the single blocking decision for the whole Part A calendar — owner ruling needed in #GapWeek (Sep 28–Oct 4) to keep either window.
A8 · Owner decisions D1–D20 — ALL OPEN (blueprint §22, L918–1014; compact list)
#
Decision
Options in the doc
D1
Launch date
Oct 2 (working) · Oct 9 slip · Sep 26 (not recommended)
D2
Funding stack
$5K + $15K+ metrics · or $5K goal + SOT $35K/$54K as stretches
D3
Prices
All TBD in source. SOT $47/yr is a candidate only
D4
Public URL
burnedoutadvisor.com · aibook.fun (expiry flag closed) · weown.academy
D5
Tier 5
Keep as Digital Access · drop · replace
D6/D7
Retreats
2027 or drop (Summer/Fall 2026 labels are past)
D8
Success metrics
Keep original targets or refresh (compressed-runway flag)
D9
Season tag
The A↔B bridge — see §B4
D10
Roster
KS-page credits vs agent lanes
D11
Legal page source
NEEDS-OWNER
D12
3:00 AM PST launch protocol
NEEDS-OWNER
D13
Holiday-adjusted production dates
NEEDS-OWNER
D14
Slip rule
Oct 9–Nov 11 recorded default
D15
Public estimated delivery
Feb 2027 working
D16
KS account + Stripe + FluentCRM exist
NEEDS-OWNER (ties to A7)
D17
Collector "exclusive extras"
Must be producible
D18
Paid budget
Ads week Oct 9–15 only if funded
D19
Scope freeze
Before pre-launch
D20
Book delivery date printed on the KS page
Feb 2027 working
A9 · Campaign ⇄ S005 integrations (why this launch carries the season)
Onboarding funnel (7021, directive 4af00908): from S004 → S005 ALL onboarding workflows allowed ONLY through the Kickstarter CAMPAIGN (channel a02e8adb, 18 members at last audit). The campaign page is the single S005 front door — every other funnel (Luma, direct joins) is superseded for onboarding.
Dev team → agent operators (WG1 D10, callnotes receipt): dev team creates the product blueprint + playbook; agent operators become primary fulfillers (Nov–Dec); season 5; "next week = gap week (S4→S5)"; season-5 flagship planned as on-chain cooperative association (compensation + restructuring) — cue 8:06 + 19:31, speakers on record in the callnotes.
Product row (PRJ-405 WG1, 4011): "AI Tools Assessment" $497 [LIMIT 100] — a fourth #ZeroTo100 bucket and a campaign-side product the S005 ladder plugs into. ⚠️Attribution OPEN (aligns with risk #6): the WG1 callnotes record dev-team fulfillment, with agent operators becoming primary fulfillers Nov–Dec — ownership of this row is NOT settled here; NEEDS-OWNER at G4.
Owner-map deliverable threads (W39 D4 learns): Academy + PLT Cloud Hybrid Architecture ($969, limit 100) + F1-Visa rows already opened as campaign deliverable threads — the reward/deliverable surface is forming in-channel.
SOT lineage (PRJ-031 learn 5017): P0 Book + Kickstarter · $47/yr subscription (NOT lifetime) · $5K/$35K/$54K goals · NFT-free KS framing · ownership-barrier 5-tier core — carried forward as the SOT-cited source for D2/D3.
PART B — TRANSITION #GapWeek Into #WeOwnSeason005
B1 · What #GapWeek IS (receipts, not vibes)
WG1 callnotes D10 row (verbatim receipt, RESEARCH/CALLNOTES_KICKSTARTER_WG1_W39D4_2026-09-24.md): "Dev team → agent operators: dev team creates product blueprint + playbook; agent operators become primary fulfillers (Nov–Dec); season 5; next week = gap week (S4→S5); season-5 flagship planned as on-chain cooperative association (compensation + restructuring)" — sourced to 3winDAO cues 8:06 + 19:31.
Ledger row receipt (mem/ccc-daycode-range.md, W39 D4 4004): #GapWeek verbatim "Week 40 is our gap week … September concludes season four".
Season clock (PLANS/WHATS_NEXT_BLUEPRINT_S004_TO_S005_W38D5_v2.md, my own pre-fold v2, CORE5-reviewed): "W40 eval buffer: Sep 28–Oct 4 (0 Office Hours — NOT idle for Academy lane; Oct 1 cohort kickoff lands here)" · "S005 boundary: Mon Oct 5".
Working definition this document adopts (from the anchors): #GapWeek = W40, Sep 28–Oct 4 — the evaluation buffer between the #WeOwnSeason004 close (Fri Sep 25, last Office Hours) and the #WeOwnSeason005 boundary (Mon Oct 5). It is a working week, not a dead week: the Academy cohort 1 kickoff (Thu Oct 1) and hype-post #5/#6 land inside it.
B2 · Season clock (v2 blueprint — quoted; weekdays verified this turn)
Milestone
Date
Weekday
State
S004 live window closes (last Office Hours)
Fri Sep 25
Fri
past
Academy cohort 1 kickoff (weown.academy 200-verified W38)
B4 · S005 entry checklist (proposals — every item lands as GTM R-011, nothing executes without it)
Boundary post Mon Oct 5 — GTM kickoff per v2 Phase 3 row 10; #WeOwnSeason005 declared live.
Season tag on the campaign (D9) — the blueprint carries "season tag still OWNER DECISION REQUIRED"; with S005 opening Oct 5 and the campaign running Oct 2–Nov 4, the campaign straddles the boundary — the D9 ruling decides whether the page/updates carry the S005 token. Owner decision.
Artifact-ID boundary (L-468, standing scope guard — carried verbatim): S005 = the 5xx family (500–599) for governance-ARTIFACT IDs (L/R/BP/D/GUIDE); "boundary = stop 4xy creation, start 5xy"; CCC-ID day lanes are a DIFFERENT family and are NOT renumbered by a season flip — any S005 CCC-ID change is a NEW ruling.
S005 repo-path ruling (OPEN, 3 options) — WeOwnSeason005/CCC org/repo created W39 D5 (488674a8) sits against the family convention (org = durable scope, season token in the REPO name, s005_<purpose>). Options on the table: A rename to s005_<purpose> · BWeOwnAI/s005_fedarch under a seasonless org · C park until finalize. Spine pick = GTM R-011.
Version-series ruling for S005 docs — this document is stamped v4.40.1-r1 (week-stamped S004 series). Whether S005 governance docs move to a v5.x series is NOT asserted here — NEEDS-OWNER (no precedent found in the anchors this turn; declared unknown, not invented).
MetaCouncil evolution — registry row (L179): MetaCouncil "will EVOLVE substantially" over the S004→S005 transition; metacouncil.md domain acquired W38 D4, NS live; the S005 notes (B3 row 8) carry the details.
PRJ-405 = the governance face of the same gap week — devTEAM → SELF SUSTAINING OCA (on-chain cooperative association = the season-5 flagship per WG1 D10); open flags: weown.dev has no A record (dark brand surface), no Luma container for the 11a ET initial conversation, OCA topology (devTEAM vs AIBook vs Buzz vs CCCbot) unresolved, token mechanics + KYC for the 7-human seats, CORE6 bot bench as first sustainability-tax payees. PRJ-405 stays its own PRJ — PRJ-440 carries the cross-link, not the ownership.
B5 · The bridge in one line
The Kickstarter campaign is the S005 onboarding funnel (7021) launched inside #GapWeek, and PRJ-405 is its governance chassis — PRJ-440 is the document that binds the two so neither ships without the other being visible.
Catch-up hype posts 1–4 (if unpublished) + post #5 TODAY
campaign lane
Sep 28
4
S004 retro + MetaCouncil S005 notes + score/VSA windows
🐝 / CG / 🛡️
Sep 29–30 / Oct 1–2
5
Hype post #6 "TOMORROW"
campaign lane
Oct 1
6
G3 fold + finalize (BP-075 re-mint if body folds)
🛡️ SEAT-3
after G2
7
G4: R-011 + SOT push _PROJECTS_/PRJ-440.md + 🐳 CCC-ID mint fold
GTM + GTM:ADMIN + 🐳
after G3
8
S005 boundary post
GTM
Mon Oct 5
📜 Version history
Rev
State
Note
v4.40.1-r1
THIS REVISION (DRAFT, G2 OPEN)
First official document artifact for PRJ-440 — the PRJ number had no prior document (orchestrator SOT scan: _PROJECTS_ = PRJ-004/403/431/432/433/444, no 440 — receipt 🐝 15:07Z). Declared-new, not a silent skip. Compiled from the six orchestrator anchors (five named in the 🐝 frame + funnel learn 7021); weekday math verified this turn.
(none prior)
—
No earlier PRJ-440 revision exists — nothing superseded.
Drift Gate note: first revision — no rN baseline of its own. Review-bar ② (additive vs anchors) is satisfied by the compile method in §🧾 (anchor load-bearing lines quoted verbatim; nothing condensed or restated as invention; pointers for the rest).
🙏 #FELG Culture — PRJ-440 in four pillars
Pillar
The PRJ-440 story
🎉 Fun
A book about ownership, launched in public with the whole family watching the counter climb.
💰 Earning
A $5,000 public floor built to fund fast — visibility, list, and proof are the win; the ladder stays honest (never blended).
📚 Learning
The submit-by clock (A7) is the lesson: working calendars age — W40's eval buffer exists exactly to catch this.
🫶 Giving
The S005 front door is one campaign page — every future member walks in through the same open funnel.
Sources (this-turn receipts)
Source
Receipt this turn
GTM directive fe88b59d (15:05:20Z, 225f18cd)
thread root; lanes [0]/[1]/[2]/+CCC-ID quoted in §🎯
🐝 orchestration frame 2771ae59 (15:09:24Z)
pipeline + 5 anchors + 6-item review bar quoted in §🔄