SinachPat 33c2af4359 docs: rewrite PRD, Spec, and Implementation Plan for clarity
Plain-language rewrite of the three AIBook.fun planning docs, with a product
review folded in:

- Name one core loop (read -> run -> share) and a single North-Star metric
  (activation), reported ahead of the fundraising numbers.
- Layer the product: v1 = the core loop; contributor economy, cohorts,
  agent-onboarding, and the ecosystem funnel become explicit later layers
  instead of co-equal launch goals.
- Add the "Minimum Lovable Library" launch gate: seed 15-20 tested workflows
  ourselves before asking anyone to pay, rather than betting the launch on the
  crowd filling an empty shelf.
- Reframe the contributor incentive honestly: today's mechanic is affiliate
  referral, not payment for writing workflows; make paid contribution a
  launch-blocking decision.
- Force the subscription-vs-lifetime pricing tension into a reasoned decision.
- Split the product-validation bar from the funding floor ("funded" != validated).
- Lead the pitch with utility; make ownership the retention layer.
- Trim governance to the two gates that matter (no-crypto scrub, truth in claims).
- Turn the domain "decision" into a same-day chore.
- Translate internal jargon, handles, and merge-history out of the doc bodies.

Old versions preserved in git history; a field-by-field ID mapping can be
produced on request.
2026-08-26 14:43:54 +01:00

11 KiB
Raw Permalink Blame History

title, type, status, owner, launch-target, last-updated, companions
title type status owner launch-target last-updated companions
AIBook.fun — Implementation Plan implementation-plan draft Patrick (Product) 2026-09-26 2026-08-26
AiBook_PRD.md
AiBook_Spec.md

📚 AIBook.fun — Implementation Plan

Status: DRAFT. The schedule below assumes decisions that aren't final yet (see "Do this week"). Dates, owners, and dollar figures are planning assumptions until signed off. This is a living document — update it weekly with actual dates and owners. See Appendix — What changed for how this revision differs from the prior draft.

The clock: today is late August 2026; launch is 9/26/2026 — roughly 4–5 weeks out. Every week counts, and the critical path has little slack. The domain expires 09-05, so step one is non-negotiable and immediate.

The critical path in one line: renew domain + make the pricing decisions → seed the Minimum Lovable Library → freeze copy → no-crypto scrub → submit to Kickstarter → launch 9/26


Do this week (the real gate zero)

Before any copy or build locks, close these. Most are decisions or de-risking, not building.

# Task Owner Why it's first
0.1 Renew aibook.fun today. It expires 09-05; launch is 09-26. Whoever holds the registrar login It's a chore, not a decision. A lapsed domain 3 weeks before launch is a self-inflicted disaster.
0.2 Decide the pricing spine — lifetime and royalties together (D-1 + D-2). Commercial lead (@GTM) Both block copy freeze; they're linked (see Spec §6).
0.3 Ratify the North-Star + product-health floors (activation, submissions, renewal). Product (@pat) + team So we measure the right thing from Day 1, not just dollars.
0.4 Ratify the Minimum Lovable Library number and assign every workflow an author. Product + co-authors This is the #1 risk; turn it from hope into owned work.
0.5 Confirm the two unconfirmed co-authors, or cut their verticals from v1 (D-3). Commercial lead (@GTM) Scope certainty before outline lock.
0.6 Open the claims register; assign a post-campaign renewal owner. Product + Commercial Truth-in-claims gate; don't leave renewal unstaffed.
0.7 Set up the Kickstarter creator account + identity verification. Campaign lead (@THY) Long lead time; do it early.

✅ Gate 0 — decisions closed. Pricing spine decided · targets ratified · Minimum Lovable Library scoped with authors · domain renewed · claims register open. Until pricing is decided, don't freeze copy. Until the domain is renewed, don't push anything live.


Phase 1 — Build (the ~3 weeks before launch)

Organized by the four workstreams. The content workstream is the critical path — a beautiful campaign around an empty library fails.

1A · Content — seed the Minimum Lovable Library (critical path)

Task Owner
Lock the chapter outline (chapters per vertical, a named owner each) Co-authors
Publish the Workflow Recipe template + 3 filled examples Product
Seed the Minimum Lovable Library to its floor number (team + co-authors write & test the workflows) Co-authors + team
3 "clone-and-run" kits, each verified by actually running it Dev + QA support
2 sample chapters (the backer preview) Two lead co-authors
Contributor onboarding doc + affiliate signup path Product + Commercial
Structured/versioned content format (so editions diff cleanly, and agents can read it later) Format support

1B · Site & domain

Task Owner
Review the staged landing-page proof-of-concept → feedback Product + Commercial
Push landing to production (only after Gate 0) — working HTTPS, analytics continuity Site admin (@GTM)
Landing page runs as a hook A/B test ("run a workflow today" vs. "own a community guide") — learn which message converts before spending ad budget Site admin + Product
Affiliates page + Kickbooster widget Commercial
Email-gated sample-chapter download flow Email lead (@LDC) + Site admin
09-12 infra freeze — DNS/SSL/registrar untouched after this date All

1C · Campaign assets

Task Owner
Kickstarter page copy (all sections, 9/26 dates) Campaign lead + exec co-author
Copy freeze — commercial terms locked (lifetime/royalties per D-1/D-2) Commercial lead (sign)
No-crypto scrub gate on every asset (translation table) Campaign lead (owner)
Hero video: script → shoot → edit (2–3 min) Creative lead (@LFG) + co-authors
Cover design + 3D mockups Creative lead
Pre-launch email sequence (3 emails) built + tagged Exec co-author + Email lead
LinkedIn organic pre-launch calendar Creative lead

1D · Community & the learning loop

Task Owner
Try-it feedback loop live in the community channel (pinned template) Product
Book Circles playbook (1 page) + pilot cohort announced Product + community
Affiliate program live: Kickbooster account, rates set, co-authors invited Commercial
Workflow-of-the-Week showcase format + first few episodes planned Product + WeOwn.FM

✅ Gate 1 — ready to rehearse. Minimum Lovable Library seeded to its floor · site live with working HTTPS · Kickstarter copy frozen · no-crypto scrub passed · pre-launch list on track to 500 · claims register current.


Phase 2 — Launch rehearsal (the final week)

Task Owner
Full dry run: page live, access-key flow tested, all tracking + affiliate links, test email send Exec co-author + Commercial
Day-1 playbook refreshed (hour-by-hour, 6am→9pm) Exec co-author
Risk sweep: re-read the risk register against current reality Product
Final pre-launch list push (target 500) All
Final claims pass — no draft/open figure on any surface Product

✅ Gate 2 — all green → LAUNCH 9/26/2026.


Phase 3 — Campaign (~33 days)

The standard Kickstarter arc:

  • Day 1 (09-26): live at 6am · launch email · all-team social · hourly backer monitoring · Day-1 goal ~30% funded + 100 backers.
  • Week 1: reply to every comment within ~2h · early-bird urgency (cap 200) · "FUNDED in X days" moment at $5K.
  • Week 2 (ads on): LinkedIn A/B (3 creatives) → scale the winner · Meta retargeting · mid emails.
  • Week 3 (mid-push): anti-dead-zone tactics — signed/personalized tier, stretch-goal announcements, guest posts, press, a live Workflow-of-the-Week episode.
  • Final 48h: 24h / 3h / final-call emails.
  • Weekly ritual: metrics vs. targets + a claims check; feed learnings into steering.

✅ Gate 3 — campaign close. ≥$5K minimum (mandatory) · report vs. $35K/$54K · affiliate share vs. 20% target · begin the handoff of backers into the ecosystem funnel. (Remember: hitting the $5K floor proves people will pre-order — it does not prove renewal or contribution. Read the product-health numbers with equal weight.)


Phase 4 — Fulfillment & the living book (post-campaign → 2027)

# Milestone Target
4.1 Campaign final update + backer emails (funded / what's next) +48h
4.2 Manuscript complete (all verticals) ~Day 60
4.3 Professional editing ~Day 75
4.4 Layout + design ~Day 85
4.5 Final proof ~Day 90
4.6 Print run (hardcopy upcharge) ~Day 95
4.7 Digital access keys issued (ledger + email; content format finalized) ~Day 100
4.8 Signed hardcopies shipped ~Day 110
4.9 All rewards fulfilled ~Day 120
4.10 Subscription renewal system live (year-2 $47/yr; lifetime honored per D-1) Day 120+
4.11 Open contribution live — with a real incentive (per D-2), now that the library exists Day 120+
4.12 Book Circles scale (pilot → several vertical cohorts); showcase becomes a regular series 2027 Q1
4.13 Annual edition v1.1 (changelog; the "stays current" promise honored) 2027 Q1
4.14 Year-1 renewal cohort tracked against the 60% target 2027 Q4
4.15 Decide whether to build the standalone platform; funnel operational 2027 Q2

Note: the source plan's "NFT minting" step becomes, publicly, "digital access key issuance." Same fulfillment, no-crypto framing.


Budget (planning baseline — reforecast at Gate 1)

Item Cost
LinkedIn ads (campaign wks 2–4) $1,300
Meta ads $700
Google ads $280
Cover / video edit $0–500
Kickstarter fees (~8% on $35K) ~$2,800
Kickbooster (~10% on referred pledges) ~$700
Domain renewal ~$15–20
Pre-revenue total ~$6,000
Projected revenue $35,000–$54,000
Projected net ~$28,500–$48,000

Who owns what

Plain roles, with the internal handle in parentheses for traceability.

Workstream Lead Support
Commercial + pricing sign-offs (D-1/D-2, domain) Commercial lead (@GTM) Campaign lead (@THY)
Campaign page, account, launch ops Campaign lead (@THY) Exec co-author (@CEO), Creative (@LFG)
Content & curation (incl. the Minimum Lovable Library) Lead co-authors (@THY + @CEO) Contributors, Product (template), dev/QA (kits)
Site / domain / affiliate tech Site admin (@GTM) Email lead (@LDC), dev (staged POC)
Email / CRM Email lead (@LDC) Exec co-author (copy)
Creative (cover / video / social) Creative lead (@LFG) All
Community & learning loop (Circles, showcase) Product (@pat) Community channel, design support
Spec / PRD / metrics / claims governance Product (@pat) Format & governance support

Dependencies in one line

Renew domain (now) → push site → pre-launch list + affiliate live · Decide pricing (this week) → freeze copy → submit to Kickstarter · Seed the library + sample chapters → hero video + backer preview → launch 9/26.

Review loop

Living artifact. Each week (post-metrics): Product updates this plan with actual dates and owners; the team reviews; deviations are noted here. Keep the claims register and content-format conformance current as you go.


Appendix — What changed in this revision

A plain-language rewrite with the product review folded in:

  1. Re-sorted around the core loop and the content risk. The old "Phase 0 decisions" now open with renewing the domain and seeding the Minimum Lovable Library — the two things most likely to sink the launch — instead of a flat list of governance gates.
  2. Domain is a same-day chore, not a gated decision (task 0.1).
  3. Added the Minimum Lovable Library as an explicit Phase-1 gate — a beautiful campaign around an empty library fails.
  4. Landing page is now a hook A/B test, not just an email-capture gate — learn which message converts before spending ad budget.
  5. Paid contribution (D-2) is on the critical path, and "open contribution" in Phase 4 is explicitly tied to having a real incentive.
  6. Product-health metrics get equal weight at campaign close — "funded" isn't "validated."
  7. Governance ceremony trimmed to the two gates that matter (no-crypto scrub, truth in claims).
  8. Jargon translated out — internal seat/role codes and merge-history removed; owners shown as plain roles with handles kept for traceability.