50 KiB
MASTER KICKSTARTER CAMPAIGN BLUEPRINT
We Own AI — The New American Dream
Status: Internal operating document — not a live Kickstarter page
Prepared: Monday, September 21, 2026
Prepared for: @LFG (campaign owner of this request) · WeOwnNet team
Working calendar (not locked): Friday, October 2 – Wednesday, November 4, 2026 · 33 days
Funding floor in source docs: $5,000
Confidential · © 2026 WeOwnNet / BurnedOut Media
#WeOwnAI · #BuildInPublic · #WeOwnSeason005 (season tag still OWNER DECISION REQUIRED)
How to read this document
| Label | Meaning |
|---|---|
| Confirmed from source | Present in the April 25, 2026 master plan PDF (21 renderable pages) or explicitly restated without change |
| Recommended (consolidated) | Strongest combined recommendation from the PDF + in-thread agent passes. Not a locked business fact |
| SOT-cited | Cited by multiple review seats from PRJ-031 / RESEARCH/AIBOOK_PRJ031_LEARN_5017.md. Treated as team source-of-truth candidates, not invented here, and not independently re-fetched in this pass |
| OWNER DECISION REQUIRED | Missing, conflicting, or policy-sensitive. Do not put on the Kickstarter page until the owner decides |
| DATE TO BE CONFIRMED | Date depends on the launch-anchor decision |
Nothing in this blueprint invents prices, print costs, shipping costs, partnership commitments, manufacturing capacity, or a locked launch date.
Kickstarter public-page rule (P0): the live campaign page, video, and ads must not use NFT / token / Web3 language. Kickstarter rejects that class of copy. Original “NFT subscription” language is preserved only as a historical/internal offer question (Decision D5) and is translated on every public-facing section to Digital Access Subscription / digital access key.
33-day convention: Kickstarter runs launch timestamp + 33 × 24 hours (exclusive span). Friday Oct 2 → Wednesday Nov 4. Inclusive counting (start + 32 days) would wrongly land on Tuesday Nov 3. Do not “fix” this later.
Table of Contents
- Executive Summary
- Campaign Vision
- Target Audience
- Campaign Messaging
- Kickstarter Page Blueprint
- Campaign Video Blueprint
- Funding Strategy
- Rewards & Pricing
- Stretch Goals
- Pre-Launch Strategy
- Launch-Day Strategy
- Campaign Marketing Plan
- Content & Creative Plan
- Campaign Timeline
- Operations & Fulfillment
- Budget & Financial Planning
- Risks & Contingency Planning
- Roles & Responsibilities
- Campaign KPI Dashboard
- Master Action Plan
- IDEA BANK
- OWNER DECISIONS REQUIRED
- AGENT CONTRIBUTION MAP
- Quality-control record
1. Executive Summary
We Own AI — The New American Dream is a multi-author book campaign on Kickstarter, published under BurnedOut Media / WeOwnNet. The April 2026 master plan (LibreOffice 24.2, created 2026-04-25, 21 pages — the file’s internal /Count 38 is stale metadata) set a $5,000 goal, a 33-day Friday→Wednesday window, seven reward tiers, and a content engine aimed at financial advisors and professionals on LinkedIn.
That original live window (June 26 – July 29, 2026) is past. This channel is tagged {Oct-2026}. An in-channel alternate (Saturday, September 26, 2026) exists on the AiBook.fun description and is not used as the working calendar: it is a Saturday (breaks the Friday protocol) and leaves ~5 days with no room for Kickstarter’s 5–7 business-day review.
Working strategy (recommended, not locked):
- Treat the $5,000 figure as the public funding floor so the campaign can fund fast and generate social proof. That philosophy is confirmed from the original plan.
- Use a Friday, October 2, 2026 launch and Wednesday, November 4, 2026 close unless the owner picks another Friday. OWNER DECISION REQUIRED (D1).
- Submit the Kickstarter page for review immediately. For an Oct 2 launch, submit-by is Wednesday, September 23, 2026. Sep 23 + 7 business days = October 2 itself — zero slack. If the page is not submitted by Sep 23, the working default becomes Friday, October 9 – Wednesday, November 11.
- Keep the original 7-tier shape (digital → early-bird → paperback → collector → ongoing digital access → two retreats) but do not publish NFT wording, blank prices, or past-season retreat labels.
- Measure success as audience + proof, not just cash: email list, backers, LinkedIn impressions, and a funded campaign that seeds later products.
What this campaign is (confirmed): a visibility and community engine for a book about AI ownership / the “new American dream,” aimed at advisors and professionals, built in public.
What this campaign is not (until the owner says otherwise): a Web3 mint, an NFT drop, or a locked $35K/$54K raise. Those figures appear only as SOT-cited options (Decision D2).
2. Campaign Vision
2.1 Mission (confirmed intent)
Build a public, fundable story around We Own AI — The New American Dream that:
- puts the book in front of financial advisors and professionals who feel burned out or displaced by AI;
- grows an owned email list of backers;
- establishes thought-leadership for WeOwnNet / BurnedOut Media;
- seeds later products, retreats, and an ongoing digital-access offer;
- funds at a deliberately achievable floor so social proof arrives early.
2.2 Campaign objective
| Layer | Objective | Source |
|---|---|---|
| Minimum | Campaign funds at $5,000 | Confirmed |
| Proof | Fund inside 48 hours; 100 backers | Confirmed targets |
| Community | 200+ new email subscribers | Confirmed target |
| Brand | LinkedIn as primary channel; #BuildInPublic narrative | Confirmed |
| After | Physical books + digital rewards fulfilled; retreats only if dates are real | Confirmed structure + owner call on seasons |
2.3 Value proposition (recommended)
For advisors and professionals who feel the ground moving under their practice,
We Own AI is a multi-author field book on owning AI as a new form of American agency — not renting it from someone else’s stack.
Unlike generic “AI will change everything” titles, this campaign is built in public by the people writing it, with a Kickstarter that is meant to fund, ship, and start a community — not to mint collectibles.
2.4 Positioning
- Category: non-fiction / professional book + community, not gadget hardware.
- Tone: candid, builder, anti-hype. Burnout is the pain; ownership is the promise.
- Proof style: #BuildInPublic process, multi-author voices, live campaign metrics.
- Differentiation (recommended): the campaign is the first chapter of the brand — advisors watch the team ship in public, then buy into the book and (optionally) the retreats.
2.5 What must not appear on the public page
- NFT, token, mint, Web3, crypto-gated access.
- Past seasons sold as current (“Colorado Summer 2026”).
- Placeholder “[TBD]” prices.
- A Saturday Sep 26 launch presented as locked.
- Invented stretch-goal dollar amounts.
3. Target Audience
Confirmed from the original plan: financial advisors and professionals, reached primarily on LinkedIn, secondarily on X/Twitter.
3.1 Primary audience
| Attribute | Working definition |
|---|---|
| Who | Practicing financial advisors, planners, and adjacent professionals |
| Problem | Burnout, feeling stuck, fear of being automated or disintermediated |
| Motivation | Practical path to use / own AI in the practice; status of being early without being reckless |
| Why Kickstarter | They fund people and ideas they can tell a story about; a low-friction digital pledge is an easy yes |
| Channel | LinkedIn (primary). BurnedOut Media cadence already designed for this feed |
3.2 Secondary audiences (recommended, from original extras)
- Operators / builders around WeOwnNet who already follow #BuildInPublic.
- Retreat-curious members who will only convert if 2027 (or contracted 2026) dates are real.
- Multi-author circle (contributors Brian and Lou, plus @THY / @CEO networks) as Day-1 surge, not as the whole market.
3.3 Ideal backer
Someone who will (a) pledge a digital tier in the first 48 hours, (b) share the campaign to two other advisors, (c) join the email list, (d) still be a reader when the paperback ships in February 2027 (recommended public delivery month — OWNER DECISION REQUIRED, D15).
3.4 Reasons they support
- The pain copy is about them (burnout / stuck), not about the authors.
- The goal looks achievable — they are not being asked to rescue a $100K gadget campaign.
- Multi-author = more than one voice they might already know.
- Digital reward is immediate-feeling; physical is a signed artifact.
- Retreats are a high-ticket identity purchase only if dates are future and specific.
4. Campaign Messaging
4.1 Core message (recommended)
Own the intelligence that is about to own your industry.
We Own AI — The New American Dream. A book, a public build, and a community for advisors who refuse to be rented their future.
4.2 Narrative arc
- The ground is moving. Advisors feel it as burnout, not as a keynote.
- Renting AI is the old deal. Tools without ownership recreate the same dependency.
- This book is the field guide. Multi-author, built in public, written from the work.
- Kickstarter is how we ship it with you. Low floor, real rewards, no vapor.
- After funding: books, access, and (if the owner keeps them) retreats.
4.3 Selling points (from source, not invented features)
- Confirmed title and positioning: We Own AI — The New American Dream
- Multi-author format (pivot already in the April wireframe)
- #BuildInPublic process as content, not as decoration
- LinkedIn-native campaign (advisors already live there)
- Deliberately fundable $5K floor → social proof
- Physical signed book + digital formats
- Optional high-touch retreat tiers if dates are real
4.4 Proof points available vs missing
| Proof | Status |
|---|---|
| Cover concepts / mockups (3 covers, 7 mockups marked approved in April) | Confirm still current |
| Team RACI and named contributors | Confirm roster (D10) |
| Live campaign metrics once launched | Generated in-campaign |
| Testimonials / advisor quotes | Not in source — do not invent. Collect during pre-launch or use process-proof instead |
| Print vendor, unit cost, ship quotes | Not in source |
4.5 Calls to action (hierarchy)
- Primary: Back the campaign on Kickstarter (digital tier as default yes).
- Secondary: Share + tag two advisors.
- Tertiary: Join the email list (FluentCRM — OWNER DECISION REQUIRED that it is live, D16).
- Do not CTA: “mint,” “token,” “join the NFT.”
4.6 Messaging hierarchy for every asset
- Pain (burnout / stuck)
- Stakes (ownership vs rental)
- Offer (book + how to back)
- Proof (progress, people, process)
- Urgency (only when true: early-bird remaining, hours left)
5. Kickstarter Page Blueprint
Original wireframe: 8 blocks + 7 tiers. Joe Pulizzi Content Entrepreneur page was the named benchmark (30 min research task). Below is the recommended public structure. Copy is directional, not final page prose.
5.1 Above the fold
- Headline: We Own AI — The New American Dream
- Subhead: A field book for advisors and professionals who want to own the AI era — not rent it.
- Hero: book mockup + (if ready) 2–3 min video. Image-only is an approved fallback.
- Primary button: Back this project
- Trust strip: 33 days · publishing under BurnedOut Media / WeOwnNet · estimated delivery February 2027 for physical (D15)
5.2 Recommended section order
| # | Section | Purpose | Visual |
|---|---|---|---|
| 1 | Hook / who this is for | Advisor recognizes themselves in one screen | Pain-led graphic |
| 2 | The problem | Burnout, displacement, rented tools | Short bullets, not a lecture |
| 3 | The book | What it is, who wrote it, why now | Cover + 3 mockups |
| 4 | What’s inside | Chapter preview / excerpt (Post 4 content) | Excerpt card |
| 5 | The authors | @THY, @CEO, Brian, Lou | 4 headshot graphics (800×800) |
| 6 | Rewards | 7 tiers as decided — no TBD, no NFT words | 7 tier images 1200×628 |
| 7 | Stretch goals | Only published goals with real unlocks | 5 graphics if amounts locked |
| 8 | Timeline / delivery | Campaign → production → ship | Simple dated infographic |
| 9 | Risks & challenges | Honest: compressed runway, print/ship, retreat dates | Plain text (KS expects this) |
| 10 | FAQ | Delivery, shipping, digital access, refunds | Text |
| 11 | How to help besides backing | Share + tag 2 advisors | Share graphic |
| 12 | Final CTA | Restate the one action | Cover + button |
Legal pages: original plan clones 6 legal pages from pTokenAssets. OWNER DECISION REQUIRED (D11) that this source is still correct.
5.3 Trust-building (recommended)
- Real names and roles; no anonymous “the team.”
- Show the April–September work as process proof (covers, mockups, wireframe) without pretending the June campaign happened.
- State Kickstarter’s all-or-nothing rule in one sentence.
- Do not claim retention, NFT scarcity, or token utility.
5.4 FAQ seeds (do not publish until answers are owned)
- When do digital vs physical rewards arrive?
- Do you ship internationally? Not in source.
- What is the ongoing digital access offer, in non-NFT language?
- What happens if a retreat date moves?
- How are refunds handled if Kickstarter funds / if a reward is delayed?
5.5 Public-language translation (mandatory)
| Internal / original | Public Kickstarter |
|---|---|
| NFT subscription model | Digital Access Subscription |
| NFT-gated content | Members-only digital library / digital access key |
| NFT model (checklist) | Ongoing digital access offer |
| eBookNFT | Never on the page (SOT-cited) |
6. Campaign Video Blueprint
6.1 Primary hero video
| Item | Value | Notes |
|---|---|---|
| Length | 2–3 minutes | Confirmed from original inventory |
| Record | @THY | Confirmed |
| Edit | @LFG | Confirmed |
| Fallback | Image-only KS page | Confirmed mitigation; likelihood now High |
If footage is not in hand this week, submit for Kickstarter review without the video. Add it post-approval. Do not hold review for the hero.
6.2 Recommended storyline (creative direction, not a locked script)
| Time | Beat |
|---|---|
| 0:00–0:12 | Hook: an advisor’s real sentence about burnout / “AI is coming for my book of business.” Face to camera. |
| 0:12–0:35 | Problem: rented tools, hype fatigue, no ownership. |
| 0:35–1:10 | The book: title, who it’s for, multi-author, flip through mockups. |
| 1:10–1:40 | Founders / why Kickstarter / built in public. |
| 1:40–2:10 | Rewards in human language (ebook, signed book, access, retreats if in scope). No NFT words. |
| 2:10–2:30 | CTA: back today, share with two advisors, we ship. |
6.3 Supporting videos (confirmed inventory)
| Video | When (working calendar) | Length |
|---|---|---|
| 15–30s ad cut from hero | Ads week (Oct 9–15 if Oct 2 launch) | 15–30 sec |
| 3–5 Live Q&A clips | Mid-campaign | 30–60 sec |
| Signing-day clip | Fulfillment | 30–60 sec |
6.4 Additional video ideas (Idea Bank — not in the original four)
HeyGen / presenter cuts already exist in adjacent WeOwnNet work. Do not commit them as Kickstarter assets unless the owner pulls them in. They are preserved in §21.
7. Funding Strategy
7.1 Confirmed logic
The $5,000 goal is intentionally low so the campaign funds quickly. Money is not the primary win; visibility, list, and proof are. Week-1 goal in the original: FUNDED + 200 backers.
7.2 Two ladders in the record — do not blend silently
| Ladder | Amounts | Status |
|---|---|---|
| Original master plan | Public goal $5,000 · stretch target in metrics $15,000+ | Confirmed in PDF |
| SOT-cited PRJ-031 | $5K minimum / $35K target / $54K stretch | SOT-cited · OWNER DECISION REQUIRED (D2) |
Recommended handling: keep $5,000 as the Kickstarter goal (the number that unlocks funding). If the owner adopts the SOT ladder, publish $35K / $54K as stretch goals, not as the KS goal. Raising the KS goal to $35K without a proven pre-launch list is how book campaigns miss. That is a recommendation, not a fact.
7.3 Duration
33 days, Friday launch, Wednesday close. Working: Oct 2 – Nov 4, 2026. Alternate recorded: Sep 26 – Oct 29 (not recommended). Slip: Oct 9 – Nov 11.
7.4 Early momentum
- Personal networks of @THY, @LFG, @CEO, @GTM, Brian, Lou on Day 1.
- Catch-up burst of the three missed hype posts (announcement / cover / who it’s for) before “TOMORROW.”
- Pre-made FUNDED graphic so the screenshot exists the minute $5K hits.
- Do not start paid ads until organic proof exists (original: ads week = week after launch).
7.5 Launch targets (confirmed unless owner refreshes — Decision D8)
| Metric | Target | Stretch |
|---|---|---|
| Raised | $5,000 | $15,000+ (or SOT $35K/$54K if adopted) |
| Backers | 100 | 300+ |
| Time to fund | 48 hours | 24 hours |
| +200 | +500 | |
| LinkedIn impressions | 50,000 | 150,000+ |
| Retreat backers | 5 | 15+ |
MiMo flagged that a compressed 11-day runway may warrant a metrics refresh. OWNER DECISION REQUIRED (D8) to keep or revise.
8. Rewards & Pricing
Seven-tier structure is confirmed. Every price is unconfirmed. SOT cites $47/year annual digital as a known value that could inform the digital / access tiers. It is not written onto the page here.
8.1 Tier structure (public names)
| Tier | Public name | Includes (from source) | Limit in source | Price |
|---|---|---|---|---|
| 1 | Digital Supporter | eBook (PDF + Kindle) + backer updates | TBD | OWNER DECISION REQUIRED |
| 2 | Early Bird eBook | eBook at a discount | 200 (confirmed limit) | OWNER DECISION REQUIRED |
| 3 | Paperback | Signed paperback + eBook | TBD | OWNER DECISION REQUIRED |
| 4 | Collector’s Bundle | Signed paperback + eBook + exclusive extras | TBD | OWNER DECISION REQUIRED |
| 5 | Digital Access Subscription | Ongoing members-only digital access + all digital rewards | TBD | OWNER DECISION REQUIRED · map to $47/yr if owner adopts SOT |
| 6 | Retreat: Colorado | Retreat ticket + signed book + all digital | TBD | OWNER DECISION REQUIRED · season/year D6 |
| 7 | Retreat: St. Pete | Retreat ticket + signed book + all digital | TBD | OWNER DECISION REQUIRED · season/year D7 |
Do not title Tier 5 “NFT Subscription” on Kickstarter.
8.2 Early-bird logic (confirmed)
Cap of 200 on the discounted eBook. Pre-make the “Early Bird SOLD OUT” graphic.
8.3 Pricing logic (recommended, not numbers)
- Digital yes-price should feel impulse-level for an advisor.
- Early-bird only works if the discount vs Tier 1 is real and the 200 cap is visible.
- Paperback must cover print + sign + pack + ship + Kickstarter fees, or the tier loses money. Unit costs are not in source — do not guess.
- Retreats should not be listed until dates exist; a retreat with no date is a policy and trust problem.
8.4 Bundles / extras
“Exclusive extras” on Tier 4 are unnamed in source. OWNER DECISION REQUIRED (D17) — possible extras (Idea Bank only): bonus PDF, annotated chapter, workshop recording, signed bookplate. Do not publish extras that are not producible.
9. Stretch Goals
Five stretch-goal graphics are planned. Amounts and unlocks are placeholders in the PDF.
9.1 Recommended structure (owner must lock amounts)
Publish stretches only after D2:
| Order | If owner keeps PDF metrics | If owner adopts SOT ladder | Unlock ideas already in source |
|---|---|---|---|
| 1 | First step above $5K | Toward $35K | Bonus chapter |
| 2 | Mid | $35K target | Audiobook sample |
| 3 | — | Between $35K and $54K | OWNER DECISION REQUIRED |
| 4 | — | $54K stretch | OWNER DECISION REQUIRED |
| 5 | $15K+ stretch in original metrics | Beyond $54K or community unlock | OWNER DECISION REQUIRED |
9.2 Rule for stretches
Each unlock must not add fulfillment risk the team cannot staff. Prefer digital unlocks (extra chapter, worksheet, live Q&A replay) over extra physical SKUs. Physical add-ons during a first book campaign are how ship dates slip.
10. Pre-Launch Strategy
Remaining runway from Sep 21 is 11 days to Oct 2, or 5 days to Sep 26 (not recommended), or 18 days to Oct 9 if review slips.
10.1 Kickstarter pre-launch activity
- Finish page copy + images enough to submit for review.
- Submit Wed Sep 23 at latest for Oct 2.
- Use Kickstarter pre-launch / “Notify me” only if the page is actually submitted — otherwise it is theater.
10.2 Landing pages & email
- Campaign site in the PDF: burnedoutadvisor.com. Candidates from review seats: aibook.fun (auto-renew confirmed in-thread; expiry flag CLOSED) and weown.academy. OWNER DECISION REQUIRED (D4).
- FluentCRM + Stripe: @GTM. Needed for list capture. Due on working calendar Sep 25.
- Blog: WordPress
/blog, Yoast/RankMath, About + Contact pages, 4 author profiles.
10.3 Six hype posts (offsets confirmed; dates assume Oct 2)
| # | Theme | Offset | Working date | Status |
|---|---|---|---|---|
| 1 | “We’re writing a book.” | Day −21 | Fri Sep 11 | Past — catch-up burst if unpublished |
| 2 | Cover reveal | Day −16 | Wed Sep 16 | Past — catch-up |
| 3 | “Who this book is for” | Day −12 | Sun Sep 20 | Past — catch-up |
| 4 | Chapter preview | Day −8 | Thu Sep 24 | Still ahead |
| 5 | “Why Kickstarter” | Day −4 | Mon Sep 28 | Still ahead |
| 6 | “TOMORROW” | Day −1 | Thu Oct 1 | Still ahead |
Do not skip 1–3 and jump to “TOMORROW.”
10.4 Community / creators / PR / paid (pre-launch)
- Original paid plan starts after launch (week 2). Do not spend pre-launch budget that is not in the source.
- Podcast/blog outreach sits with @CEO in the RACI — no named outlets in source. Do not invent a media list.
- Influencer plan: not specified beyond “share + tag 2 advisors” and personal networks. That is the creator strategy until the owner adds names.
10.5 Testing
- Test every KS link, image, and (if present) video before launch week.
- Test ad account with a small budget before ads week (@CEO, due Oct 8 on working calendar).
- Rehearse the 3:05 AM PST LinkedIn fire or change the protocol (D12).
11. Launch-Day Strategy
Assume working launch Friday, October 2, 2026. Shift the clock, not the sequence, if D1 changes.
11.1 First 24 hours (confirmed protocol)
| Time (PST) | Action |
|---|---|
| 3:00 AM | Wake. War mode. D12 if this is not real. |
| 3:05 AM | LinkedIn launch post LIVE (6:05 AM EST) |
| 5:00 AM | X/Twitter launch post LIVE (8:00 AM EST) |
| 6:00 AM | Reply to everything within 1 hour |
| 9:00 AM | “X% funded in Y hours” graphic + post |
| 12:00 PM | Reply every comment on the launch post |
| 3:00 PM | Second progress post |
| 6:00 PM | Backer milestone graphic if earned |
| 9:00 PM | Day 1 recap |
Week-1 goal: $5,000 funded + 200 backers. Reply within 2 hours thereafter. DM thank-you to every backer who shares publicly. Post FUNDED the minute it is true.
11.2 First 48–72 hours
- Backer Update 1 (Day 2–3): thank you, Day 1 stats, what’s next.
- Keep LinkedIn + 3–5 X posts/day.
- Do not turn on the full ad set until organic proof exists (original: ads week = following week).
- If funding is slow despite the low goal: activate remaining personal networks before spending.
11.3 First week (Fri Oct 2 – Thu Oct 8)
- Daily milestone graphics (25 / 50 / 75 / 100%).
- Behind-the-scenes LinkedIn.
- Protect @LFG rest window if the compressed runway is already eating the operator.
12. Campaign Marketing Plan
One coordinated engine. LinkedIn is the spine.
12.1 Organic social
- LinkedIn / BurnedOut Media: 10 posts/week through close (original cadence).
- Campaign LinkedIn: daily + extras during the 33 days.
- X: 3–5/day, adapted from LinkedIn, not raw dumps.
- Mid-campaign: “Share + tag 2 advisors.”
- Mid-campaign: Live Q&A with @THY (LinkedIn Live or Zoom, 30 min + 30 min prep), then 3–5 clips.
12.2 Email
FluentCRM. Backer updates on Kickstarter are not a substitute for an owned list. Eight backer-update slots are in §15/§20.
12.3 Paid
| Item | Plan |
|---|---|
| When | Week after launch (working Oct 9–15) |
| Creative | 3 angles × 2 sizes: Pain, Solution, Social Proof |
| Sizes | 1200×628 and 1080×1080 |
| Platforms | LinkedIn + Meta |
| Video | 15–30s cut from hero |
| Owner | @CEO strategy / campaign manager; @LFG creative |
| Budget | Not in source — OWNER DECISION REQUIRED (D18) |
12.4 PR / creators / partnerships / communities
Source gives podcast/blog outreach as a @CEO workstream with no outlet list. Recommended: start with contributors’ own audiences and advisor groups the team already belongs to. Do not cold-pitch a fabricated journalist list.
12.5 Retargeting
Not specified in the PDF. Logical extension of Meta/LinkedIn ads only if D18 includes budget and pixels exist. Otherwise skip.
12.6 Campaign updates (confirmed slots, Oct 2 calendar)
| Update | Timing | Content |
|---|---|---|
| 1 Thank you | Oct 3–4 | Day 1 stats |
| 2 Progress | Oct 8–11 | Proof + quotes |
| 3 Stretch | When unlocked | Unlock + next tease |
| 4 Mid | Oct 16–19 | BTS, writing, team |
| 5 Final push | Oct 29–31 | Hours, not hype |
| 6 Close | Nov 4–5 | Stats + what next |
| 7 Production | Dec 2026 – early Jan 2027 | Layout progress |
| 8 Shipping | late Jan 2027 | Tracking |
12.7 Final countdown (working close Nov 4)
| Milestone | Date | Notes |
|---|---|---|
| 48 hours left | Mon Nov 2 | 3:00 AM graphic + noon update |
| 24 hours left | Tue Nov 3 | 6:00 PM |
| Final day | Wed Nov 4 | 3:00 AM, every 2–3 hours, 6:00 PM “3 hours,” 9:00 PM “1 hour” |
| Close | Nov 4 at launch hour + 33 days | Not automatically 11:59 PM |
| Celebration | Thu Nov 5 morning | Thank-you + stats |
13. Content & Creative Plan
13.1 Graphics (~60+ confirmed)
Finish unfinished items in Remaining Prep. Sizes stay as original.
Priority for review-submit (this week): cover, mockups, 7 tier images, page headers, author headshots. Stretch-goal graphics can follow if amounts are locked; do not upload “TBD” stretch tiles.
13.2 Video — see §6
13.3 Social / ads / email / landing
- 6 pre-launch images (catch-up + remaining).
- Launch day, FUNDED, 4 milestone %, 10 countdown, 48/24/final, thank-you, stats, what-next, share+tag, early-bird sold out, 5 stretch unlocks, 2 retreat graphics.
- 6 ad images.
- Blog ~1/week through close.
- Legal pages, About, Contact, author profiles.
13.4 Asset production rule
Batch remaining graphics in 48-hour blocks (burnout mitigation). Do not open new creative concepts that are not on this list unless D19 (scope) says so.
14. Campaign Timeline
Anchor: working launch Fri Oct 2, 2026. Every date below is DATE TO BE CONFIRMED until D1 is signed. Slip calendar = add 7 days (Oct 9 launch).
| Stage | Working dates | Objective |
|---|---|---|
| Research / planning | Historical (Mar–Apr 2026 PDF) | Done — do not reopen |
| Asset creation (remaining) | Sep 21–27 | Covers, tiers, page, video-or-fallback |
| Audience building | Catch-up Sep 21–23 + Posts 4–6 | Do not skip 1–3 |
| KS submission / review | Submit by Wed Sep 23 | 5–7 business days; 7 days lands on Oct 2 |
| Launch preparation | Sep 28 – Oct 1 | Launch package, FUNDED, milestones, link test |
| Launch day | Fri Oct 2 | Protocol §11 |
| Live campaign | Oct 2 – Nov 4 | Fund, ads week Oct 9–15, Q&A Oct 16–22, countdown Oct 23–Nov 4 |
| Final push | Oct 23 – Nov 4 | Daily countdown |
| Close | Wed Nov 4 | Timestamp = launch hour + 33d |
| Post-campaign comms | Nov 5–6 | Recap + what-next |
| Production | Jan 8 eBook layout target; Jan 15 format | Avoid Christmas (literal Day 85 = Fri Dec 25) |
| Fulfillment | Signing Jan 22; shipped graphic Jan 29; public delivery Feb 2027 | D13–D15 |
Pre-launch post dates and fulfillment Fridays are weekday-verified on the Oct 2 calendar (independent seats: 19/19 and 26/26 named dates).
Sep 26 Saturday alternate: +33 exclusive days = Thu Oct 29. Recorded, not used.
15. Operations & Fulfillment
15.1 Production
Original offsets from launch: Day 85 interior layout, Day 90 eBook format, Day 105 signing, Day 110 shipped graphic. From Oct 2 those literals are Dec 25 / Dec 30 / Jan 14 / Jan 19. Christmas is unusable.
Working production targets (holiday-adjusted):
| Deliverable | Literal offset | Working target |
|---|---|---|
| Recap graphic | Day 34 = close day | Thu Nov 5 |
| What-happens-next | Day 35 | Fri Nov 6 |
| Interior layout | Day 85 = Christmas | Fri Jan 8, 2027 |
| eBook Kindle + PDF | Day 90 | Fri Jan 15, 2027 |
| Signing content | Day 105 | Fri Jan 22, 2027 |
| Books-shipped graphic | Day 110 | Fri Jan 29, 2027 |
Print vendor, bindery, inventory, and postage are not in the source. Do not promise a ship method you have not bought.
15.2 Customer communication
Eight backer updates (§12.6). Reply-to-everything rule during the live campaign. Post-campaign cadence drops to 3–5 hrs/week.
15.3 Contingency
- Image-only page if video is late.
- Slip launch if KS review is open on launch morning (D14).
- Digital rewards can ship before paperbacks. State that on the page.
- Retreats: drop from the live page rather than sell a past season.
15.4 Connectivity / ops note
StarLink +50GB priority data at Orlando Azur Resorts was logged in-thread as infrastructure for on-site execution. It is not campaign copy.
16. Budget & Financial Planning
Almost every dollar figure below $5,000 / $15,000+ is missing from source. This section is a ledger of categories, not a fake budget.
16.1 Known or source-stated
| Item | Amount | Notes |
|---|---|---|
| Kickstarter goal | $5,000 | Confirmed floor |
| Metrics stretch | $15,000+ | Confirmed as a metric, not a KS goal |
| SOT target / stretch | $35,000 / $54,000 | SOT-cited only |
| Digital annual (SOT) | $47/yr | SOT-cited only |
| Team hours | 200–250 hrs | Confirmed estimate |
| Remaining prep this week | 18–24 hrs | Compressed |
| Launch week | 25–30 hrs | Confirmed |
16.2 Must be costed before launch (all OWNER DECISION REQUIRED)
| Category | Why it matters |
|---|---|
| Kickstarter + payment processing fees | Net ≠ goal |
| Print unit cost × expected paperbacks | Tier 3/4 can lose money |
| Shipping + mailers + signing logistics | Drives delivery month |
| Ad spend (LinkedIn + Meta) | D18 |
| Software (FluentCRM, Canva, SEO plugin) | May already be paid — not in PDF |
| Retreat COGS | Do not sell below cost |
| Contingency reserve | Recommended: do not spend the whole $5K on ads |
Do not put a made-up fee percentage or print quote on the page.
17. Risks & Contingency Planning
Likelihoods updated for an 11-day remaining runway.
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| KS review still open on launch day | High | High | Submit Sep 23; slip rather than launch unapproved (D14) |
| Hero video missing | High | High | Image-only fallback; add video later |
| NFT/Web3 language in the page | High if unfixed | High (rejection) | Translate all four original references before submit |
| Blank prices / past retreat seasons on the page | High if unfixed | High | Lock D5–D7 and prices or remove those tiers |
| @LFG burnout | High | High | Batch graphics; one rest window before launch week |
| Cover not approved | Medium | High | Three options, hard deadline Wed Sep 23 |
| Slow Day-1 funding | Low (given $5K) | Medium | Personal networks first |
| Ad account not ready | Low | Medium | Setup before Oct 8; tiny test |
| Contributor bios/headshots late | Medium | Low | Deadline Sep 25 |
| Holiday collision on production | High if using raw Day 85 | Medium | Use January/February 2027 |
| Selling a past retreat | High if unfixed | High | 2027 or drop |
| Domain confusion | Medium | Medium | Pick one public URL (D4). aibook.fun expiry is closed (auto-renew) |
| Inflating KS goal to $35K with no list | Medium if D2 goes that way | High | Keep $5K as the KS goal; put $35K/$54K on stretches |
| Sep 26 Saturday launch | High if chosen | High | Breaks Friday protocol; no review slack |
18. Roles & Responsibilities
Assignments below are from the April PDF RACI. Confirm the roster still holds (D10). No new names added.
18.1 Named roles (source)
| Role | Handle | Responsibilities |
|---|---|---|
| Author / Visionary | @THY | Book content, video recording, cover approval, KS account, retreat dates, final sign-off |
| Creative Lead / Execution | @LFG | Graphics, social, KS page build, video edit, daily engagement, website |
| CEO / GTM Strategy | @CEO | Ad account, campaign manager, paid ads, podcast/blog outreach, business strategy |
| GTM Support | @GTM | KS page review, Stripe + FluentCRM, technical infrastructure |
| Contributing Author | Brian | Chapter, headshot, bio |
| Contributing Author | Lou | Chapter, headshot, bio |
18.2 RACI (source)
| Workstream | @THY | @LFG | @CEO | @GTM |
|---|---|---|---|---|
| Book content & title | R/A | I | C | I |
| Cover & mockups | A | R | I | I |
| KS page build | A | R | C | C |
| Hero video | R record | R edit | I | I |
| Social LinkedIn/X | C | R/A | C | I |
| Paid ads | I | R creative | R/A strategy | I |
| Website & blog | C | R/A | I | C |
| Stripe & email | I | I | C | R/A |
| Retreats | R/A | R graphics | C | I |
| Backer comms | A | R | C | I |
| Fulfillment | R/A | R design | C | C |
18.3 AI / agent lane (this thread — coordination, not KS-page credits)
Agents produced revision, verification, and this blueprint. They are not Kickstarter “creators” unless the owner says so. Nemotron / similar TRAINS-on-DATA seats were flagged to stay structural-only around pricing placeholders.
19. Campaign KPI Dashboard
Monitor before and during. Do not invent baselines that were not measured.
19.1 Pre-launch
| KPI | Why | Source target |
|---|---|---|
| KS page submitted (Y/N) + review status | Critical path | Submit Sep 23 |
| Email subscribers | Owned audience | +200 / +500 during campaign |
| Hype posts 1–6 shipped (Y/N) | Catch-up vs hole | 6 |
| Cover approved (Y/N) | Blocks page | Sep 23 |
| Hero video or fallback chosen | Blocks quality, not review | This week |
Cost-per-lead, conversion rate, and ad CAC are not in source. Track them once ads run; do not publish fake benchmarks.
19.2 Live campaign
| KPI | Target | Stretch |
|---|---|---|
| Funding % vs $5K | 100% in 48h | 24h |
| Total raised | $5,000 | $15K+ or SOT ladder |
| Backers | 100 | 300+ |
| Average pledge | derive, don’t invent | — |
| KS visits | not in source | track in KS dashboard |
| LinkedIn impressions | 50,000 | 150,000+ |
| Blog posts | 8 | 12 |
| Retreat backers | 5 | 15+ |
| Comment reply time | <2 hours | <1 hour on launch day |
19.3 Ads (if D18 funds them)
Spend, CTR, CPC, CPA, and which of the 3 angles wins. Kill the loser after a small test; do not “complete the plan.”
20. Master Action Plan
Status values: Open unless the April PDF marked the work complete. “Mostly complete” items are Verify, not redo.
DO NOW (Sep 21–23)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Lock launch date (D1) | One calendar | Owner | @THY + @GTM + @LFG | Today | Open |
| Strip NFT/Web3 from all public copy | Survive KS review | D5 (offer may stay; words must go) | @LFG | Before submit | Open |
| Submit KS page for review | Start 5–7 day clock | Page complete enough; KS account (D16) | @THY account · @LFG build | Wed Sep 23 | Open |
| Cover + title confirmation | Unblock graphics | @THY | @THY | Sep 23 | Verify |
| Catch-up posts 1–3 | Don’t jump to TOMORROW | Images | @LFG | Sep 21–23 | Open |
| Confirm public domain (D4) | One URL on the page | Owner | Owner | Before submit | Open |
| Confirm roster (D10) | Authors on the page are real | Owner | Owner | Before submit | Open |
BEFORE PRE-LAUNCH (still this week)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Hero footage or fallback call | Page can ship | @THY time | @THY / @LFG | Sep 23–25 | Open |
| Stripe + FluentCRM | List is real | @GTM | @GTM | Sep 25 | Open |
| Bios + headshots | Authors section | Brian, Lou, @THY, @CEO | Contributors | Sep 25 | Open |
| Legal pages source (D11) | KS compliance pages | Owner | @LFG | Before submit | Open |
| Retreat keep/drop (D6, D7) | No past-season SKUs | @THY dates | @THY | Sep 24 | Open |
| Prices on all live tiers | KS will ask | D3, D5, D17 | Owner | Before submit | Open |
PRE-LAUNCH (Sep 24 – Oct 1)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Post 4 chapter preview | Keep sequence | Excerpt exists | @LFG | Thu Sep 24 | Open |
| Post 5 Why Kickstarter | Educate | — | @LFG | Mon Sep 28 | Open |
| Post 6 TOMORROW | Hype | Posts 1–3 actually out | @LFG | Thu Oct 1 | Open |
| Launch package + FUNDED + milestones | Fire on time | Graphics | @LFG | Sep 28–Oct 1 | Open |
| Link/video QA | No broken page | Page | @LFG | Oct 1 | Open |
| Rehearse 3:05 AM PST or change it | Don’t discover at 3 AM | D12 | Launch operator | Oct 1 | Open |
| Confirm KS approval in hand | Go / slip | Review | @THY / @LFG | Oct 1 | Open |
LAUNCH WEEK (Oct 2–8)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Execute §11 protocol | Fund + 200 backers | Approval | @LFG + @THY | Oct 2 | Open |
| Reply <2h; DM sharers | Social proof | — | @LFG | Daily | Open |
| FUNDED graphic when true | Screenshot moment | $5K | @LFG | Triggered | Open |
| Backer update 1 | Trust | Day 1 stats | @LFG / @THY | Oct 3–4 | Open |
| Ad account ready | Ads week | @CEO | @CEO | Oct 8 | Open |
LIVE CAMPAIGN (Oct 9 – Oct 22)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Ads live (3×2) | Scale after proof | Creative + budget D18 | @CEO / @LFG | Oct 9–15 | Open |
| Video ad cut | If hero exists | Hero | @LFG | Oct 9–15 | Open |
| Share + tag post | Organic | Graphic | @LFG | Oct 16–22 | Open |
| Live Q&A + clips | Mid-campaign energy | @THY | @THY / @LFG | Oct 16–22 | Open |
| Updates 2–4 | Trust | — | @LFG | Per §12.6 | Open |
FINAL PUSH (Oct 23 – Nov 4)
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Daily countdown graphics | Urgency that is true | — | @LFG | Oct 23–Nov 4 | Open |
| 48h / 24h / final hours | Close strong | Clock | @LFG | Nov 2–4 | Open |
| Update 5 | Last chance | — | @LFG | Oct 29–31 | Open |
| Close at launch-hour + 33d | Correct timestamp | D1 | — | Nov 4 | Open |
| Celebration Nov 5 | Thank / stats | Final numbers | @LFG | Nov 5 | Open |
POST-CAMPAIGN
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Recap + what-next | Set delivery expectations | Close | @LFG | Nov 5–6 | Open |
| Update 6 | Close story | — | @LFG / @THY | Nov 4–5 | Open |
FULFILLMENT
| Task | Objective | Dependencies | Role | Timing | Status |
|---|---|---|---|---|---|
| Interior layout | Physical book | Files, designer | @THY / @LFG | Jan 8, 2027 | Open |
| eBook format | Digital delivery | Layout | @LFG | Jan 15, 2027 | Open |
| Signing day content | Proof of physical | Printed stock | @THY / @LFG | Jan 22, 2027 | Open |
| Ship + graphic | Close the loop | Postage, list | @THY / @LFG | Jan 29, 2027 | Open |
| Updates 7–8 | No radio silence | — | @LFG | Dec–Jan | Open |
21. IDEA BANK
Valuable ideas that are not in the primary path, or were proposed by one seat, or would add scope. Kept so they are not silently deleted.
| Idea | Origin | Why it is not primary | When to pull it in |
|---|---|---|---|
| Public KS goal = $35K / stretch $54K | SOT-cited PRJ-031 | Conflicts with confirmed $5K floor philosophy | Only if D2 chooses the SOT ladder and pre-launch list supports it |
| $47/yr as the named Digital Access price | SOT-cited | Not in the PDF; would invent if published without D3 | If owner adopts |
| weown.academy as campaign URL | 🌾 MiMo | Third candidate after burnedoutadvisor.com and aibook.fun | D4 |
| Refresh impression/backer targets for 11-day runway | 🌾 MiMo | Original 100 / 50K / $15K+ still usable | D8 |
| HeyGen presenter videos as KS supporting films | Adjacent WeOwnNet packages in OUTBOX | Not in the 4-video inventory | If hero cannot be recorded |
| Joe Pulizzi page as literal clone structure | Original W11 task | Benchmark, not a second book | Optional 30-min study still useful |
| Inclusive 33-day close (Nov 3) | KIMI arithmetic note | KS exclusive clock is the one that charges | Never — document the convention instead |
| Keep “NFT” internally for a later non-KS product | Original Tier 5 | KS-banned on the live page | After campaign, off-platform, if legal |
| Fall 2026 St. Pete if already contracted | Original Tier 7 | Tight vs Oct campaign | Only with a real contract date |
| Paid retargeting / pixel | Extension of ads plan | No budget in source | D18 |
| International shipping matrix | Common KS need | Not in source | Before paperback launch, with real quotes |
| Named journalist / podcast list | @CEO workstream | No names in source | Owner-supplied only |
| Credit AI agents on the KS page | This thread | Not requested; can look gimmicky | Owner call |
| Image-only forever (no hero) | Risk table | Weaker than a 2-min founder video | If @THY cannot record |
| 3 AM PST as a brand ritual | Original protocol | Operator-health risk | D12 |
22. OWNER DECISIONS REQUIRED
Every unresolved decision in one place. Campaign page should not go to Kickstarter review until D1, D4, D5 (language), prices, and retreat keep/drop are answered. Others can follow but will show up as holes.
D1 — Launch date
- Options: (A) Fri Oct 2 – Wed Nov 4 (working) (B) Fri Oct 9 – Wed Nov 11 (slip if review not in) (C) Sat Sep 26 – Thu Oct 29 (in-channel; not recommended) (D) another Friday the owner names.
- Why it matters: every date in this document hangs on it. Sep 26 has no review slack and breaks Friday protocol.
- Need: a single yes.
- Depends: §§10–15, 20.
D2 — Funding stack
- Options: (A) KS goal $5K, metric stretch $15K+ (PDF) (B) KS goal $5K, published stretches $35K / $54K (SOT on top of PDF) (C) raise the KS goal itself to $35K (not recommended without list proof).
- Why: the number on the button vs the numbers on the stretch bar.
- Need: which ladder is public.
- Depends: §§7, 9, 19.
D3 — Digital / access pricing
- Options: leave TBD (blocks review) · adopt SOT $47/yr for Digital Access · owner-supplied prices for Tiers 1–5.
- Why: Kickstarter rejects hollow rewards.
- Need: dollar amounts and whether $47/yr is the access tier.
- Depends: §§8, 16.
D4 — Public brand URL
- Options: burnedoutadvisor.com (PDF) · aibook.fun (SOT; auto-renew closed the expiry flag) · weown.academy (MiMo).
- Why: every CTA and legal page points somewhere.
- Need: one URL.
- Depends: §§5, 10, 12.
D5 — Tier 5 scope
- Options: (A) keep the offer, public name Digital Access Subscription (B) drop the tier (C) replace with something owner-defined.
- Why: original was “NFT subscription”; KS will reject that language even if the offer stays.
- Need: in or out, plus public name.
- Depends: §§5, 8, 17.
D6 — Colorado retreat
- Options: Summer 2027 · drop · a specific contracted date.
- Why: “Colorado Summer” 2026 is past.
- Depends: Tiers, graphics, KPIs.
D7 — St. Pete retreat
- Options: Fall 2026 if contracted · Fall 2027 · drop.
- Why: same as D6; Fall 2026 is tight against an Oct campaign + Feb book delivery.
- Depends: Tiers, graphics, KPIs.
D8 — Success metrics
- Options: keep 100 backers / 50K impressions / $15K+ · refresh for compressed runway.
- Depends: §19.
D9 — Season tag
- Options: #WeOwnSeason005 (working, matches Oct-2026 / S005) · remain on 004 · other.
- Depends: headers, social.
D10 — Roster
- Options: confirm @THY / @LFG / @CEO / @GTM / Brian / Lou · update names.
- Depends: KS authors block, RACI, headshots.
D11 — Legal page source
- Options: still clone 6 pages from pTokenAssets · other counsel/source.
- Depends: KS compliance.
D12 — 3:00 AM PST launch protocol
- Options: keep · shift to a later first-post time with a named operator.
- Depends: §11.
D13 — Holiday-adjusted production dates
- Options: accept Jan 8 / 15 / 22 / 29, 2027 · owner-supplied dates.
- Depends: §15.
D14 — Slip rule
- Options: if review is open on launch morning, slip to next Friday (recommended) · launch anyway (not recommended).
- Depends: D1, review gate.
D15 — Public estimated delivery
- Options: February 2027 for physical (recommended) · other month the owner can actually hit.
- Depends: KS page, backer trust.
D16 — KS account + Stripe + FluentCRM actually exist
- Options: confirm live · name the blocker.
- Depends: submit, email, checkout.
D17 — Collector “exclusive extras”
- Options: name producible extras · drop “exclusive extras” until named.
- Depends: Tier 4.
D18 — Paid budget
- Options: $0 until organic · owner-set cap for Oct 9–15.
- Depends: §§12.3, 16, 19.3.
D19 — Scope freeze
- Options: this blueprint’s asset list is the list · owner adds HeyGen / extra SKUs.
- Depends: burnout risk, §13.
D20 — Book delivery date printed on the KS page
- Overlaps D15; original dependency #4 owned by @THY.
23. AGENT CONTRIBUTION MAP
Honesty about inputs: this thread did not contain nine independent full campaign plans. It contained one original master plan (PDF), one full date-revision, and multiple independent verification / strategy passes. Unique ideas from each are mapped below so nothing is silently credited or dropped.
| Source | What it contributed to this blueprint |
|---|---|
| Original PDF (Apr 25, 2026 · 21 pages · LibreOffice 24.2) | Title, $5K philosophy, 33-day Fri→Wed shape, 7 tiers, 5 stretch slots, RACI, 8-block wireframe, 6 hype posts, 3 ad angles, 60+ graphics, 4 videos, 305-piece cadence, launch-day clock, 8 backer updates, Pulizzi benchmark, pTokenAssets legal clone, Joe-Friday 6:05/8:00 EST, 200 early-bird cap |
🚀 LFG-Grok revision (84bcde9e · OUTBOX Oct-2026 plan) |
Recast to Oct 2–Nov 4; season 005; phase collapse; holiday-shifted fulfillment; catch-up posts; raised review/video/burnout likelihoods; 16 confirmation flags; exclusive 33-day close; Sep 26 recorded but unused |
| 🛡️ GTM-GLM (orchestrate + fold-list) | 4 NFT hits not 3; F1–F8 fold list; 21-page correction vs “38”; zero-slack review math; aibook.fun auto-renew closes expiry; slip-to-Oct-9 as load-bearing |
| MC-BA-IMAIT-META-GLM | 19/19 date math; P0 NFT compliance; SOT $35K/$54K and $47/yr and domain discrepancy; self-corrected NFT count to 4; Post-1 Day −21 original error acknowledged |
| MC-BA-IMAIT-META-KIMI | Original internal contradictions (phase length, week restart, W16/W17 overlap, Day −21, 60-day vs Day 110, Day 85 ≠ Sep 21, 34 vs 33); zero-slack submit-by; §1.2 as the unflagged NFT strategy sentence; domain-expiry self-correction accepted |
| MC-BA-IMAIT-META-GROK | 26/26 weekday check; SOT pass; inclusive vs exclusive close clarification; do not reopen 09-05 domain flag |
| 🌾 GTM-MiMo | Full PDF date inventory; Sep 26 vs {Oct-2026} conflict table; weown.academy as third URL; metrics-may-need-refresh; coordination lane map |
| MC-BA-CCC-META | Decision frame: two blockers (launch date + NFT); deduped owner table; drift-gate that 13 original sections were preserved; page-count /Count 38 explanation |
| @GTM | Join / resume; StarLink +50GB Azur (ops note only); orchestration directions |
| @LFG (this request) | Mandate to synthesize a 20-section operating blueprint + Idea Bank + Decision Register + Contribution Map, rather than another date-swap |
Seats that had not posted a unique campaign document in-thread at synthesis time (QWEN, Nemotron, Laguna, FedArchBuzz) are not assigned invented ideas. If they later add unique checks, fold them into §21 / §22 without renumbering D1–D20.
24. Quality-control record
Second review against the six phase gates in the request:
| Check | Result |
|---|---|
| Every provided document considered | Yes: PDF extract, Oct-2026 revision, and every in-thread verification pass listed in §23 |
| Strong ideas not lost | Pulizzi, pTokenAssets, 200 cap, 3 ad angles, 3 AM protocol, image-only fallback, catch-up burst, Christmas collision, zero-slack review, SOT ladder, $47/yr, three URLs, exclusive 33-day note — primary or Idea Bank |
| Duplicates consolidated | Date audits merged; NFT count standardized at 4 original body hits; domain expiry closed |
| Conflicts addressed | Launch date, funding ladder, URL, NFT language, 33-day convention, retreat seasons — all in §22, not silently picked |
| Old campaign dates removed from live plan | June 26 / July 29 appear only as historical source. Live calendar is Oct 2–Nov 4 or marked DATE TO BE CONFIRMED |
| Dates internally consistent | Same exclusive +33 arithmetic as the verified revision |
| Unverified info not stated as fact | SOT figures labeled SOT-cited; prices not invented |
| Financial numbers not invented | No fake print, ads, or fee math |
| Owner decisions identified | D1–D20 |
| Actionable | §20 sequenced as DO NOW → FULFILLMENT |
| Reads as one strategy | Operations PDF + review science folded into LFG’s 20-section spine |
P0 before Kickstarter submit: D1 (or accept working Oct 2) · NFT language gone · no TBD prices on live tiers · no past-season retreats · page submitted by Sep 23 or slip to Oct 9.