--- title: "AIBook.fun — Implementation Plan (CONSOLIDATED v1.0-DRAFT)" type: implementation-plan tags: [aibook, weown-ai, prj-031, implementation, kickstarter, roadmap, responsible-agentic-ai, social-education] status: draft created: 2026-08-22 source-of-truth: "https://github.com/CCCbotNet/fedarch/blob/main/_PROJECTS_/PRJ-031_WeOwnAI-Book.md" generated: by: "AI:CCC-MAIT-S004-PAT-DeepSeek (SEAT-1 governance/OKF) + ProductBuzz [PAT] (Product Ops) — merged v0.2, amended v0.3" at: "2026-08-22T15:36:00Z" verified: - by: "curl github.com/CCCbotNet/fedarch (PRJ-031 SOT v3.2.1.3)" at: "2026-08-22" - by: "buzz channels list (relay) — bMAIT AiBook.fun channel desc" at: "2026-08-22" sources: - id: sot resource: "https://github.com/CCCbotNet/fedarch/blob/main/_PROJECTS_/PRJ-031_WeOwnAI-Book.md" note: "PRJ-031 v3.2.1.3 — pre-launch/launch/post phases, budget, risks, team" - id: spec resource: "PLANS/AIBOOK_SPEC.md" - id: prd resource: "PLANS/AIBOOK_PRD.md" - id: pb-impl resource: "PLANS/AIBOOK/AIBOOK_IMPLEMENTATION_PLAN.md (ProductBuzz draft v0.1)" note: "Parallel draft merged into this canonical — 5-phase skeleton, gates, RACI" --- # 📚 AIBook.fun — Implementation Plan **CONSOLIDATED v1.0-DRAFT** · 2026-08-22 · **ProductBuzz [PAT]** (Product Ops) + **CCC-MAIT-S004-PAT-DeepSeek** (SEAT-1 governance/OKF) · Owner: @pat · R-011 gates: @GTM · **⛔ DRAFT — not a live claim. No R-011.** (v1.0-final naming reserved for R-011'd freeze.) > v1.0-DRAFT consolidation (2026-08-22T15:36:00Z, SEAT-1 after ProductBuzz self-review 15:22Z): trunk = v0.3. Folded F1 (gates G0–G3 kept; G4 dropped everywhere — the "G0–G4" lived only in the channel summary, not the file) · S4 (Phase 0.8 reworded: D-7 as @pat override review of DRI floor ruling). v0.3 amendment history below: > v0.3 amendment (2026-08-22T13:36Z, Product Ops review): frontmatter timestamp corrected (v0.2 was future-dated) · floor references aligned to DRI ruling (see SPEC §P6). **Anchors:** Today = 2026-08-22 (W34·D6) · **Kickstarter launch = 9/26/2026** (CONFIRMED, W39·D6) · Domain expiry **09-05** (auto-renew must confirm W35) · SOT campaign skeleton reused with refreshed dates. **Critical path:** G0 decisions → copy freeze → scrub gate → KS submit → **9/26** — ~34 days; every week counts. --- ## Phase 0 — Decisions & hard gates (W34 now → W35, by 2026-09-01) | # | Task | Owner | Due | Gate | |:--|:--|:--|:--|:--| | 0.1 | **D-3: confirm aibook.fun auto-renew** (or renew manually now) | @GTM | **W35 (09-01)** | G0 🔴 | | 0.2 | **D-1: lifetime tier decision** (yes/no, price, position vs $47/yr) | @GTM (R-011) | W35 | G0 🔴 | | 0.3 | **D-2: royalty mechanics** (affiliate-only per SOT, or add royalty pool) | @GTM (R-011) | W35 | G0 🔴 | | 0.4 | Ratify metric targets (PRD §6) — never quote DRAFT figures | ProductBuzz + team | W35 | G0 | | 0.5 | Open claims-register entries (Spec §7) with promotion rules | ProductBuzz | W35 | G0 | | 0.6 | Assign renewal owner (post-campaign) | @GTM | W35 | G0 | | 0.7 | KS creator account + identity verification | @THY | W35 | G0 (SOT PL-1) | | 0.8 | D-7: @pat override review of DRI floor ruling (F1 confidentiality · F2 cross-customer · F3 off-domain, all FLOOR 0) — closes override window (S4) | @pat | W35 | G0 | | 0.9 | Workflow Recipe schema v0.1 + 3 example Recipes | SEAT-2 Laguna + PAT satellites | W35 | G0 | **Gate G0 (09-01):** D-1/D-2/D-3 answered; targets ratified; claims entries open. Without D-3, downstream builds on a domain that may lapse — **pause production push, not content work.** --- ## Phase 1 — Build (W35–W37, 09-01 → 09-19) ### 1A · Content (critical path: sample chapters + workflow template) | Task | Owner | Due | |:--|:--|:--| | Book outline locked (chapters per vertical, SOT §Co-Authors) | @THY + @CEO + @GTM | W35 | | Workflow document template v1 (Spec §4.1) published to contributors | ProductBuzz | W35 | | **3 learn-by-running kits** (clone-and-run; verified by running) | SEAT-2 Laguna + PAT-QA S4 | W36 | | **Sample chapter 1** (flagship vertical) | @THY | W36 | | **Sample chapter 2** | @CEO | W36 | | Contributor onboarding doc + affiliate signup path | ProductBuzz + @GTM | W36 | | Workflow-of-the-Week #1 (showcase starter) | Curators | W37 | | Co-author outreach: B.W. Piper (Higher Ed), L. Kerner (Communities) | @GTM | W36 (D-6) | | OKF bundle scaffolding (Book as knowledge bundle, frontmatter/sources/trust tiers) | SEAT-1 DeepSeek | W37 | ### 1B · Site & domain | Task | Owner | Due | |:--|:--|:--| | Framer POC review (`217fbfc` staged) → feedback | @pat + @GTM | W35 | | **Push to production** (only after G0); SSL cert; GA continuity (UA-59154711-35) | @GTM:ADMIN | W36 | | aibook.fun/affiliates page + Kickbooster widget | @GTM | W36 | | Sample-chapter download flow (email-gated via FluentCRM `book-prelaunch`) | @LDC + @GTM | W37 | | **09-12 infra freeze** (DNS/SSL/registrar untouched after) | all | 09-12 ⚠️ | ### 1C · Campaign assets | Task | Owner | Due | |:--|:--|:--| | KS page copy (SOT PL-3 sections) with refreshed dates | @THY + @CEO | W36 | | **Copy freeze — commercial terms** (lifetime/royalties locked, D-1/D-2) | @GTM sign | **W37 (09-18)** | | NFT-free scrub gate on ALL assets (translation table) | @THY (owner) | W37 | | Hero video script → shoot → edit (2–3 min) | @LFG + co-authors | W37 | | Cover design + 3D mockups (SOT PL-2) | @LFG | W37 | | Prelaunch email sequence (3) built + tagged | @CEO + @LDC | W37 | | LinkedIn organic prelaunch calendar (SOT W14–W15 pattern) | @LFG | W37 | ### 1D · Community & education loop | Task | Owner | Due | |:--|:--|:--| | Book Circles playbook (1 page) + pilot cohort announced | ProductBuzz + bMAIT | W37 | | Try-it feedback loop live in bMAIT AiBook channel (pinned template) | ProductBuzz | W37 | | Affiliate program live: Kickbooster account, rates 15/10/10/5, invite co-authors | @GTM | W36 (SOT impl plan) | | #FlowsBros episode format + 4-episode campaign slate (W39-W42) | ProductBuzz + WeOwn.FM | W37 | | Two-tab (green/red) boundary UX spec for post-campaign member lane | PAT-Design S2 + PAT-Trust S5 | W38 (build = Ph4) | **Gate G1 (09-19):** site production + SSL green · KS copy frozen · scrub gate passed · prelaunch list ≥ 300 (track → 500 by 09-25) · claims register current. --- ## Phase 2 — Launch rehearsal (W37→W38, 09-19 → 09-25) | Task | Owner | Due | |:--|:--|:--| | Full dry run: page live, keys workflow test, UTM links, affiliate links, email send test | @CEO + @GTM | 09-23 | | Day-1 playbook (SOT W16 table, times 6:00→21:00) refreshed | @CEO | 09-23 | | Risk sweep: re-read SOT risk matrix + PRD §7 against current state | ProductBuzz | 09-24 | | Prelaunch list final push (target 500) | ALL | 09-25 | | Final claims pass: no DRAFT/OPEN figure on any surface | ProductBuzz + SEAT-1 | 09-25 | **Gate G2 (09-25):** all checks green → **LAUNCH 9/26/2026**. --- ## Phase 3 — Campaign (9/26 → ~10/29, 33 days) Reuse SOT W16–W20 skeleton with refreshed dates: - **Day 1 (09-26):** KS live 6:00 AM · launch email · LinkedIn by all team · Signal · X · texts · hourly backer monitoring · Day-1 goal 30% + 100 backers (SOT). - **Week 1:** reply-to-every-comment SLA (2h) · early bird urgency (200 cap) · "FUNDED in X days" at $5K. - **Week 2 (ads on):** LinkedIn A/B (3 creatives, SOT B-01/B-02/B-03) → scale winner · Meta retargeting · mid emails. - **Week 3 (mid push):** dead-zone tactics (SOT 7-item list): signed+personalized tier $68, stretch-goal announcements, guest posts, press outreach, **#FlowsBros episode** on WeOwn.FM. - **Final 48h:** 24h/3h/final-emails per SOT W19–W20. - **Weekly ritual (Ops):** metrics vs PRD §6 + claims check; feed learnings into steering; **hive-mind sync-back to 🎉💰📚🫶︱CCC︱MAITs** weekly (SEAT-1). **Gate G3 (campaign close):** ≥$5K min (mandatory), report vs $35K/$54K; affiliate share ≥20% target; backers → AgencyPRO pipeline handoff begins. --- ## Phase 4 — Fulfillment & the living book (post-campaign, ~10/29 → 2027) | # | Milestone | Target | Owner | |:--|:--|:--|:--| | 4.1 | Campaign final update + backer emails (funded/what's-next) | +48h | @CEO | | 4.2 | Manuscript complete (all verticals) | Day 60 | @THY + @CEO + contributors | | 4.3 | Professional editing | Day 75 | contractor | | 4.4 | Layout + design | Day 85 | @LFG | | 4.5 | Final proof | Day 90 | @THY | | 4.6 | Digital access keys issued (ledger CSV + email; OKF bundle final) | Day 100 | @GTM + SEAT-2 | | 4.7 | Print run (hardcopy upcharge) | Day 95 | @GTM | | 4.8 | Signed hardcopies shipped | Day 110 | @THY | | 4.9 | All rewards fulfilled | Day 120 | ALL | | 4.10 | **Subscription renewal system live** ($47/yr year-2, lifetime tier honored per D-1) | Day 120+ | @GTM + @LDC | | 4.11 | Workflow library open for submissions (affiliate income; royalty pool only if D-2 signed) | Day 120+ | Curators | | 4.12 | Book Circles scale: pilot → 6 vertical cohorts; #FlowsBros regular season | 2027 Q1 | ProductBuzz + bMAIT | | 4.13 | **Annual edition v1.1** (changelog; "updated as AI evolves" promise honored) | 2027 Q1 | SEAT-2 + curators | | 4.14 | Year-1 renewal cohort tracked (PRD §6 target 60%) | 2027-10 | ProductBuzz | | 4.15 | eBookNFT platform decision (build/shelve) + AgencyPRO pipeline operational | 2027 Q2 | @GTM | > Fulfillment timeline mirrors SOT §Post-Campaign ("NFT minting" row becomes **"digital access key issuance"** in the public plan — NFT-free framing). --- ## Budget (SOT baseline — reforecast at G1) | Item | Cost | |:--|:--| | LinkedIn Ads (campaign W2–W4) | $1,300 | | Meta Ads | $700 | | Google Ads (W3–W4) | $280 | | Cover design / video edit | $0–500 (@LFG) | | eBookNFT domains | $216 (already spent) | | Kickstarter fees (5% + 3% on $35K) | ~$2,800 | | Kickbooster (10% on referred) | ~$700 | | **Pre-revenue total** | **~$5,996–$6,496** | | Projected revenue | $35,000–$54,000 | | Projected net | $28,500–$48,000 | > Add: aibook.fun renewal (~$15–20/yr — confirm at D-3). Reforecast at G1 (> W35). ## Workstream ownership (RACI-lite) | Workstream | Lead | Support | |:--|:--|:--| | Commercial + R-011 gates (D-1/D-2/D-3, pricing) | @GTM | @THY | | Campaign page + account + launch ops | @THY | @CEO, @LFG | | Content & curation | @THY + @CEO | contributors, ProductBuzz (template), SEAT-2 (kits) | | Site/domain/affiliate tech | @GTM | @LDC (CRM), Laguna (dev, staged POC) | | Email/CRM | @LDC | @CEO (copy) | | Creative (cover/video/social) | @LFG | ALL | | Social education (Circles, #FlowsBros, showcase) | ProductBuzz [PAT] | bMAIT AiBook channel, PAT-Design S2 | | **Spec/PRD/metrics/claims governance** | **ProductBuzz [PAT]** | DeepSeek SEAT-1 (governance review), @pat (owner) | | OKF conformance + CCC-ID discipline + sync-back | 🧩 SEAT-1 DeepSeek (PAT) | FedArchBuzz (origin) | | Trust floor (ZDR stance, NFT-free gate, two-tab UX) | PAT-Trust S5 | PAT-QA S4 co-verifies | ## What blocks what (dependencies in one line) D-3 domain (W35) → site push (W36) → prelaunch list + affiliate live · D-1/D-2 terms (W35) → copy freeze (W37) → KS submit · sample chapters (W36) → hero video + backer preview (W37) → launch (09-26). ## Review loop Living artifact. Weekly (Fridays, post-metrics): ProductBuzz updates it + SSOT (`RESEARCH/WEOWN_CHAT_SSOT.md` → add PRJ-031 section) with actual dates/owners; @pat reviews; deviations published to this thread. SEAT-1 keeps CCC-ID/OKF/claims conformance current. --- *CONSOLIDATED v1.0-DRAFT — single canonical version (v0.3 trunk + F1 + S4). Superseded drafts preserved at `PLANS/AIBOOK/` (v0.1 trio) pending @pat archive call. #LLMmodel: DeepSeek V4 Flash 0731.*