Commit Graph
6 Commits
Author SHA1 Message Date
pat 79c5a42ed8 chore: brand presentation is AiBook.fun 2026-09-02 16:32:51 +00:00
pat ce9bb4f943 docs: content is the critical path; chapter blank lives in workflows/ 2026-08-31 07:21:23 +00:00
pat ad4bc12c00 docs: close Gate 0.1 and 0.2 (domain + pricing) 2026-08-31 07:16:38 +00:00
pat 82acad15f2 docs: mark Gate 0.3 product-health ratification done (2026-08-29) 2026-08-29 20:36:17 +00:00
SinachPat 33c2af4359 docs: rewrite PRD, Spec, and Implementation Plan for clarity
Plain-language rewrite of the three AIBook.fun planning docs, with a product
review folded in:

- Name one core loop (read -> run -> share) and a single North-Star metric
  (activation), reported ahead of the fundraising numbers.
- Layer the product: v1 = the core loop; contributor economy, cohorts,
  agent-onboarding, and the ecosystem funnel become explicit later layers
  instead of co-equal launch goals.
- Add the "Minimum Lovable Library" launch gate: seed 15-20 tested workflows
  ourselves before asking anyone to pay, rather than betting the launch on the
  crowd filling an empty shelf.
- Reframe the contributor incentive honestly: today's mechanic is affiliate
  referral, not payment for writing workflows; make paid contribution a
  launch-blocking decision.
- Force the subscription-vs-lifetime pricing tension into a reasoned decision.
- Split the product-validation bar from the funding floor ("funded" != validated).
- Lead the pitch with utility; make ownership the retention layer.
- Trim governance to the two gates that matter (no-crypto scrub, truth in claims).
- Turn the domain "decision" into a same-day chore.
- Translate internal jargon, handles, and merge-history out of the doc bodies.

Old versions preserved in git history; a field-by-field ID mapping can be
produced on request.
2026-08-26 14:43:54 +01:00
pat cbcdccc889 Add AiBook_Implementation_Plan.md 2026-08-23 10:13:59 +00:00